Difference between revisions of "One Week Pause in Running"
From Hall D Ops Wiki
(→One Week Pause in Running) |
(→One Week Pause in Running) |
||
Line 5: | Line 5: | ||
==[[Tune Photon Beam]]== | ==[[Tune Photon Beam]]== | ||
==One Week Pause in Running== | ==One Week Pause in Running== | ||
− | + | * Goal: Reinstall tagger detectors/electronics and check data. | |
− | + | * Responsibility: Hall D | |
− | + | * Priority: High | |
− | + | * Conditions: | |
− | # | + | # Beam off in the Hall. |
− | + | ||
− | # | + | * Acivities |
− | # | + | # Reinstall the tagger detector, TAGM and the electronics, reconnect the cables. |
− | # | + | # Check validity of the data taken so far. Use as feedback to detector settings. |
+ | # Check/modify the online monitoring histograms based on data. | ||
+ | # Using reconstructed tracks find the location of the beam spot | ||
==[[Collect Beam Data for Detector Checkout]]== | ==[[Collect Beam Data for Detector Checkout]]== |
Revision as of 11:29, 7 August 2014
Contents
Main Page
Tune Electron Beam
Tune Photon Beam
One Week Pause in Running
- Goal: Reinstall tagger detectors/electronics and check data.
- Responsibility: Hall D
- Priority: High
- Conditions:
- Beam off in the Hall.
- Acivities
- Reinstall the tagger detector, TAGM and the electronics, reconnect the cables.
- Check validity of the data taken so far. Use as feedback to detector settings.
- Check/modify the online monitoring histograms based on data.
- Using reconstructed tracks find the location of the beam spot