Difference between revisions of "Tune Electron Beam"

From Hall D Ops Wiki
Jump to: navigation, search
(Tune Electron Beam)
(Tune Electron Beam)
Line 15: Line 15:
 
# Shielding walls installed
 
# Shielding walls installed
 
# Radiation monitors installed and operational
 
# Radiation monitors installed and operational
# Collimator block in the position between two holes, shielding the central area of the beam pipe
+
# Primary collimator block in the position between two holes, shielding the central area of the beam pipe. Secondary collimator removed.
 
# Profiler counter installed in front of the collimator
 
# Profiler counter installed in front of the collimator
  

Revision as of 14:03, 12 August 2014

Main Page

Tune Electron Beam

  1. Tagger microscope (TAGM) and all the crates with electronics should be removed from Hall D.
  2. Goniometer in the beam-open position. The goniometer will not be used during the 2014 run
  3. Amorphous radiator ladder equipped (HAPR included) and operational
  4. Beam lines under vacuum
  5. Tagger magnet operational
  6. Shielding walls installed
  7. Radiation monitors installed and operational
  8. Primary collimator block in the position between two holes, shielding the central area of the beam pipe. Secondary collimator removed.
  9. Profiler counter installed in front of the collimator
  • Conditions:
  1. Pulsed beam pulsed beam 4-10 µA (average 60-150 nA) for the beam tune
  2. CW beam 50-100 nA at the final stage of the procedure
  3. No radiator
  4. Hall D quadrupole magnet MQPAD00 turned off
  5. Hall D/Tagger Hall locked
  6. No shift workers in Hall D; experts from Hall D are involved with the radiation measurements
  • Activities:
  1. Tune the pulsed beam to the dump, check the beam specifications, send the CW beam (accelerator).
  2. Check radiation levels in the tagger hall (Hall D/RadCon).
  3. Check for photons (with the Profiler and Active Collimator) and radiation levels in the collimator cave (Hall D/RadCon).
  • Responsibility: Main: Accelerator; support: HallD, RadCon.

Tune Photon Beam

One Week Pause in Running

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data