==Tune Electron Beam==
 
 
==Tune Electron Beam==
 
==Tune Electron Beam==
 
* Goal: provide a clean electron beam through the center of the beam aperture to the beam dump in the tagger hall with acceptable radiation levels.
 
* Goal: provide a clean electron beam through the center of the beam aperture to the beam dump in the tagger hall with acceptable radiation levels.

Revision as of 10:36, 8 August 2014

Main Page

Tune Electron Beam

  1. Tagger microscope (TAGM) and all the crates with electronics should be removed from Hall D.
  2. Goniometer in the beam-open position. The goniometer will not be used during the 2014 run
  3. Amorphous radiator ladder equipped (HAPR included) and operational
  4. Beam lines under vacuum
  5. Tagger magnet operational
  6. Shielding walls installed
  7. Radiation monitors installed and operational
  8. Collimator block in the position between two holes, shielding the central area of the beam pipe
  9. Profiler counter installed in front of the collimator
  • Conditions:
  1. Pulsed beam pulsed beam 4-10 µA (average 60-150 nA) for the beam tune
  2. CW beam 50-100 nA at the final stage of the procedure
  3. No radiator
  4. Hall D quadrupole magnet MQPAD00 turned off
  5. Hall D/Tagger Hall locked
  6. No shift workers in Hall D; experts from Hall D are involved with the radiation measurements
  • Activities:
  1. Tune the pulsed beam to the dump, check the beam specifications, send the CW beam (accelerator).
  2. Check radiation levels in the tagger hall (Hall D/RadCon).
  3. Check for photons (with the Profiler and Active Collimator) and radiation levels in the collimator cave (Hall D/RadCon).
  • Responsibility: Main: Accelerator; support: HallD, RadCon.