BCAL calibration links, 2020, PrimEx, SRC
From GlueXWiki
Run Period 2020
- Mean and sigma of 2Gamma mass as a function Run Number [1]
- Mean as a function of Channel Number; we did this during the Spring 2020 Run period when we had "THE INCIDENT" a metal ball falling on Module 26: [2], [3]
PrimEx
- 28 May 2020 [4]
- 30 April 2020 [5]
- 16th April 2020 [6]
- 1st April 2020 [7]
SRC