Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 15-Apr-2011 9:30 am ARC 231


Agenda

  • Coil 3 installation status and cooldown schedule
  • Status of fixes/improvements
    • Danfysik power transistor
    • quench detector
    • document trip chains
    • slow dump
    • new wiring
  • PLC coding status
  • VME-based fast DAQ system
    • connection to I/O module, voltage division, overvoltage protection
    • readout software status
  • Testing in B field: VME/VXS crates, HV/LV crates, SiPM's
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • Coil 2 repair status
  • IRMIS
  • Preparing for moving into the hall