Coil Test Weekly Meeting 15-Apr-2011
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 15-Apr-2011 9:30 am ARC 231
Agenda
- Coil 3 installation status and cooldown schedule
- Status of fixes/improvements
- Danfysik power transistor
- quench detector
- document trip chains
- slow dump
- new wiring
- PLC coding status
- VME-based fast DAQ system
- connection to I/O module, voltage division, overvoltage protection
- readout software status
- Testing in B field: VME/VXS crates, HV/LV crates, SiPM's
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- IRMIS
- Preparing for moving into the hall