Coil Test Weekly Meeting 29-Apr-2011
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 29-Apr-2011 9:30 am ARC 231
Agenda
- Coil 3 warmup/repair status and new schedule
- To be done for coil 3 measurements
- Danfysik power transistor, fault sequencer and slow dump
- new wiring
- PLC programming
- VME-based fast DAQ system
- Document trip chains
- Testing in B field: VME/VXS crates, HV/LV crates, SiPM's
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- IRMIS
- giving up on JBoss, switching to GlassFish
- Preparing for moving into the hall