Coil Test Weekly Meeting 8-Apr-2011
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 8-Apr-2011 9:30 am ARC 231
Agenda
- New halldusers password
- Coil 3 installation status
- Improvements needed for coil 3
- Danfysik power transistor
- quench detector
- document trip chains
- trip sequence diagnosis system
- slow dump
- new wiring
- PLC system improvements
- additional licenses and modules
- New VME-based fast DAQ system
- hardware status
- software status
- protecting VME board from over-voltage
- Other testing with coil 3
- VXS/VME crates in B field
- SiPM tests
- others?
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- IRMIS
- Preparing for moving into the hall