JEF meeting, March 7, 2025
From GlueXWiki
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
Preparing for the run -- Sasha
Restoring PS test setup [1]
ECAL commissioning -- Sasha, All
Calibrations
Minutes
Attendees: Hakob, Vlad, Igal, Olga, Liping, Mac, S.T.
- 2 reference PMTs for LMS ready to go
- Installed power cable for the ECAL LMS light source
- Flash ADC installed for ECAL reference PMTs
- Signals from alpha source + fiber light seen
- Waiting for final installation with radcon tag
- Progress toward implementing Lead Glass+Lead tungstate prototype in PS setup
- Plan for 5x5 lead tungstate array plus (hopefully) 5x5 lead glass array
- Malte to provide lead glass modules
- Still deciding whether or not to use Cockroft-Walton bases
- Space in EEL126 to work on assembly
- Readout crate for prototype in place