m (Agenda)
Line 37: Line 37:
 
*''' Abstracts for the DNP meeting''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/Abstract-DNP-2024-4.pdf][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/poster_abstract.docx]
 
*''' Abstracts for the DNP meeting''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/Abstract-DNP-2024-4.pdf][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/07_05_2024/poster_abstract.docx]
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''
** Update on the eta->pi+pi-e+e- channel studies [https://halldweb.jlab.org/DocDB/0065/006567/001/JEF%20Meeting%20July%2012th.pdf] -- Stjep
+
** Update on the eta->pi+pi-e+e- channel studies [https://halldweb.jlab.org/DocDB/0065/006567/001/JEF%20Meeting%20July%2012th.pdf] -- Stjepan
  
 
=Minutes=
 
=Minutes=

Revision as of 11:27, 15 July 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
    • - HV distribution boards: has not yet been designed, need 4 boards
    • - LV cables: missing about 20 cables, waiting for the last delivery batch.
    • - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers Media:lv_distribution.jpg
    • - LED: prototype board is ready, have to start testing
  • Ongoing projects - All
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - File:Regulators.xlsx Map of dividers with removed regulators
    • - Testing procedure [2]
    • - All dividers have been fabricated and tested by George [3]
      • Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Report from students [4]
    • Installation and testing cables and dividers [5]
    • Installation of signal patch panels [6][7]
    • Installation of long signal cables [8]
    • Connecting signal cables to patch panels [9]
    • Installing LV patch panels and cables [10]
    • Installation of optical fibers [11]
    • Detector installation page
  • Summer students -- Sasha
    • - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
    • - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • FCAL2 posters for open house** File:1-OH24-Poster-H-Laveen-revised4.pdf
  • Abstracts for the DNP meeting [12][13]
  • Analysis/Simulation
    • Update on the eta->pi+pi-e+e- channel studies [14] -- Stjepan

Minutes

Attendees: Bill, Sasha, Phil, Stjepan, Laveen, Shane, Ben, Jon, Zisis, Susan, Vlad, Olga, Igal, S.T.

  • 4 LV distribution boards have been prepared, need to be populated with connectors
  • Some LMS fibers need to be fixed
  • Cabling continues -- almost complete on bottom half, start to work on upper half week of 7/15/24
  • Vlad suggested we should get scaler readout working soon -- DAQ not ready to go yet
  • Stjepan presented MC studies of η→e+e-π+π- signal and background studies
    • Added E(FCAL) to tree to study E/p for lepton/pion separation -- seems to work reasonably well
    • Look at asymmetry of distribution of angle φ between π+π- and e+e- planes
      • Expect A=0 because no asymmetry is introduced in thrown MC
      • Measured A~0, some small asymmetry appears to be introduced by detector acceptance
    • Largest background from bggen is from π+π-π0 with conversion of one γ or Dalitz decay from π0