Difference between revisions of "JEF meeting, September 2, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(One intermediate revision by the same user not shown) | |||
Line 12: | Line 12: | ||
*** 20 more CRYTUR crystals have been ordered. | *** 20 more CRYTUR crystals have been ordered. | ||
*** currently available/ordered + CCAL: 1593 + (9) + 20 (recent order) = 1622 (may need to order more spares (?) ) | *** currently available/ordered + CCAL: 1593 + (9) + 20 (recent order) = 1622 (may need to order more spares (?) ) | ||
− | |||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]. Remaining components: | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]. Remaining components: | ||
*** 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps) | *** 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps) | ||
Line 19: | Line 18: | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 682 | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 682 | ||
*** <span style="color:#FF0000"> All currently available </span> | *** <span style="color:#FF0000"> All currently available </span> | ||
+ | ** Meeting with the DSG group: Mindy and George will continue working on the project in September | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
− | ** Received 72 PMT housings from Tim | + | ** Received 72 + 76 PMT housings from Tim |
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
** Fabricated modules: <span style="color:#FF0000"> Total 1206 (a new milestone)</span> | ** Fabricated modules: <span style="color:#FF0000"> Total 1206 (a new milestone)</span> |
Latest revision as of 09:31, 2 September 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals. [1]
- 30 CRYTUR crystals received from Physics division
- 20 more CRYTUR crystals have been ordered.
- currently available/ordered + CCAL: 1593 + (9) + 20 (recent order) = 1622 (may need to order more spares (?) )
- Preparation of parts[2][3][4]. Remaining components:
- 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
- 200 light guides, will be delivered during a couple of next weeks.
- 400 PMT housings, expect to receive during next two months (bottleneck now)
- Wrapped CRYTUR crystals: 682
- All currently available
- Meeting with the DSG group: Mindy and George will continue working on the project in September
- Crystals. [1]
- Module fabrication -- Sasha
- Received 72 + 76 PMT housings from Tim
- Status of fabrication
- Fabricated modules: Total 1206 (a new milestone)
- All SICCAS 576 SICCAS
- 630 CRYTUR, Remaining: 52
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Work on amending safety docs
- All students will leave during this week (11 students have been working on the project during this summer)
- Great job !
- (had also a chance to work on the CCAL project [8])
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Light Monitoring System -- Arshak