Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"
From GlueXWiki
(Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...") |
m (→Past 24 hours) |
||
Line 11: | Line 11: | ||
= Thursday, September 8 = | = Thursday, September 8 = | ||
=== Past 24 hours === | === Past 24 hours === | ||
− | * Maintenance day | + | * [https://logbooks.jlab.org/entry/4039104 Maintenance day] |
* Work done in hall: | * Work done in hall: | ||
− | **Removed Be target: | + | **[https://logbooks.jlab.org/entry/4038926 Removed Be target], [https://logbooks.jlab.org/entry/4038959 Installed He target and ramped magnet]: |
− | + | **[https://logbooks.jlab.org/entry/4038961 Fixed connection for missing channels in ST]: | |
− | **Fixed missing channels in ST: | + | |
**Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847] | **Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847] | ||
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896] | *LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896] |
Revision as of 07:54, 8 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, September 8
Past 24 hours
- Maintenance day
- Work done in hall:
- Removed Be target, Installed He target and ramped magnet:
- Fixed connection for missing channels in ST:
- Replaced FCAL bases & one PMT: [1], [2]
- LHe Target full and ready after ~11 hours, [3]
- More details can be found here
Issues
Plan
- Rate+Trigger Studies (Sasha)
- Begin(continue) production on LHe Target @200nA