Difference between revisions of "JEF meeting, October 14, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 8: | Line 8: | ||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
** Prepare to order 25 CRYTUR crystals | ** Prepare to order 25 CRYTUR crystals | ||
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 727 (10 since last week) ] |
− | *** Available for wrapping: 762 - | + | *** Available for wrapping: 762 - 727 = 35 |
*** DSG group continues wrapping | *** DSG group continues wrapping | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] |
Revision as of 08:49, 14 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Prepare to order 25 CRYTUR crystals
- Wrapped CRYTUR crystals: 727 (10 since last week)
- Available for wrapping: 762 - 727 = 35
- DSG group continues wrapping
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1291 (44 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 715 CRYTUR, available: 47
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Preparation of parts for FCAL2 modules -- Sasha
- Light Monitoring System -- Arshak