'''Preparation of parts for ECAL''' -- Sasha
 +
* - long HV cables - done
 +
* - HV distribution boards  [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg]
 +
::  - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors
 +
::  - Sent out request of quotes for HV boards
 +
* - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg]
 +
'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen
 +
* Installation and testing dividers has been completed [https://logbooks.jlab.org/entry/4316213]
 +
:: - need to arrange cables on chains  - done
 +
:: - need to arrange cables on cable trays - done [https://logbooks.jlab.org/entry/4316915]
 +
:: - preparing spare cables (7 short  HV, 8 signal and LV) -done
 +
* Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207]
 +
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928]
 +
:: - rocecal3 crate is working now [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928])
 +
:: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4317789]
 +
:: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done
 +
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 +
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
 +
* Meeting with Drew Weisenberger regarding Vlad'd involvement in commissioning
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings]
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings]
=Agenda=
+
* Remaining installation tasks
*'''Preparation of parts for ECAL''' -- Sasha
+
::  - Connecting cooling pipes to the ECAL fan (done by tech group)
*'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen
+
::  - Installing dark room ceiling and insulation inside the room, required for cooling test (next week)
*'''Students''' -- Sasha
+
::  - Test cooling system (next week)
*'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]  
+
::  - Installing HV distribution boards, start switching the detector ON  (waiting for HV boxes) 
*''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
+
'''Students''' -- Sasha
 +
* Visit of Zhikun from Wuhan
 +
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]  
 +
 
 +
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All

Revision as of 09:12, 4 October 2024

Meeting time and location:


Preparation of parts for ECAL -- Sasha

  • - long HV cables - done
  • - HV distribution boards [1][2]
- 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors
- Sent out request of quotes for HV boards
  • - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [3]

Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen

  • Installation and testing dividers has been completed [4]
- need to arrange cables on chains - done
- need to arrange cables on cable trays - done [5]
- preparing spare cables (7 short HV, 8 signal and LV) -done
  • Installation of the light distribution board of the ECAL LMS [6]
  • Implementing ECAL into the GlueX DAQ [7]
- rocecal3 crate is working now [8] (initial DAQ implementation [9])
- implementing flash ADC scalers [10]
- translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done
- Connecting cooling pipes to the ECAL fan (done by tech group)
- Installing dark room ceiling and insulation inside the room, required for cooling test (next week)
- Test cooling system (next week)
- Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)

Students -- Sasha

  • Visit of Zhikun from Wuhan

Restoring PS test setup [11]