* - long HV cables - done | * - long HV cables - done | ||
* - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] | * - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] | ||
− | :: - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors | + | :: - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors (one distribution board is ready, one more board will be ready during next week) |
− | :: - Sent out request of quotes for HV | + | :: - Sent out request of quotes for HV board boxes |
+ | :: - Consider to build temporarry boxes for testing | ||
* - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg] | * - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg] | ||
'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All | '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All |
Revision as of 09:17, 4 October 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Preparation of parts for ECAL -- Sasha
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors (one distribution board is ready, one more board will be ready during next week)
- - Sent out request of quotes for HV board boxes
- - Consider to build temporarry boxes for testing
- - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [3]
Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
- Installation and testing dividers has been completed [4]
- - need to arrange cables on chains - done
- - need to arrange cables on cable trays - done [5]
- - preparing spare cables (7 short HV, 8 signal and LV) -done
- Installation of the light distribution board of the ECAL LMS [6]
- Implementing ECAL into the GlueX DAQ [7]
- Detector installation page
- Safety briefings
- Meeting with Drew Weisenberger regarding Vlad'd involvement in commissioning
- FCAL2 Engineering Meetings
- Remaining installation tasks
- - Connecting cooling pipes to the ECAL fan (done by tech group)
- - Installing dark room ceiling and insulation inside the room, required for cooling test (next week)
- - Test cooling system (next week)
- - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)
Students -- Sasha
- Visit of Zhikun from Wuhan
Restoring PS test setup [11]
ECAL commissioning -- Sasha, All