Difference between revisions of "JEF meeting, October 4, 2024"
From GlueXWiki
(→Minutes) |
|||
(9 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
+ | = Connection = | ||
+ | |||
Meeting time and location: | Meeting time and location: | ||
*9:30 am EST (JLab time) remote only | *9:30 am EST (JLab time) remote only | ||
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | ||
+ | |||
+ | = Agenda = | ||
Line 8: | Line 12: | ||
* - long HV cables - done | * - long HV cables - done | ||
* - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] | * - HV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg] | ||
− | :: - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors | + | :: - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors (one distribution board is ready, one more board will be ready during next week) |
− | :: - Sent out request of quotes for HV | + | :: - Sent out request of quotes for HV board boxes |
+ | :: - Consider to build temporarry boxes for testing | ||
* - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg] | * - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg] | ||
− | '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha | + | '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
* Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207] | * Installation of the light distribution board of the ECAL LMS [https://logbooks.jlab.org/entry/4317207] | ||
+ | :: - Fine-tune the light source | ||
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928] | * Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928] | ||
− | :: - rocecal3 crate | + | :: - rocecal3 crate was fixed [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928]) |
:: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4317789] | :: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4317789] | ||
− | :: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done | + | :: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [https://logbooks.jlab.org/entry/4317904] |
+ | :: - implementing and verifying ECAL LMS trigger [https://logbooks.jlab.org/entry/4317903] | ||
+ | :: - implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [https://logbooks.jlab.org/entry/4317905] | ||
+ | :: - Installation of scintillating paddles for cosmic tests [https://logbooks.jlab.org/entry/4317905] | ||
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | * [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | * [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings] | ||
Line 31: | Line 36: | ||
:: - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes) | :: - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes) | ||
'''Students''' -- Sasha | '''Students''' -- Sasha | ||
− | * | + | * Zhikun arrived to the lab |
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | '''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Bill, Sasha, Igal, Vlad, Laveen, Zisis, Ilya, Stjepan, S.T. | ||
+ | * Student from Wuhan has arrived | ||
+ | * HV pcbs arrived, connectors being soldered onto boards, one set ready to go | ||
+ | * Still missing boxes to house these pcbs, plan to build temporary solution | ||
+ | * Position of LV distribution panels lowered, need to be re-cabled | ||
+ | * Need to increase light intensity for LMS | ||
+ | ** Prototype light input using 5 LEDs leeds to small amplitudes (~100 mV) | ||
+ | ** Would like to increase light intensity 10x | ||
+ | *** Many possible solutions considered: tune pulse width? increase number of LEDs? get rid of integrating sphere? | ||
+ | * DAQ commissioning continues | ||
+ | ** Translation table for ECAL done, still working on translation table for lead glass | ||
+ | ** ECAL low-level scalers from DAQ system working, EPICS scalers still need work | ||
+ | ** Can read out digihits for ECAL (read out all 7 ECAL crates) -- flashADC waveforms seen! | ||
+ | ** Front panel LMS trigger working, progress on ECAL physics trigger (working, energy sum from signal pulses induced by the LMS) | ||
+ | *** However: barely enough CTP (Crate Trigger Processor) modules (no spares) | ||
+ | *** Plan to use new type of board for trigger: VXS Trigger Processor (VTP) | ||
+ | **** Have 8 VTPs to replace CTPs, installed one | ||
+ | **** VTPs need new firmware -- one month needed? | ||
+ | * Cosmic ray setup: installed scintillator paddle below FCAL, will install one above FCAL | ||
+ | * Cooling system installation/testing and dark room ceiling proceeding | ||
+ | * ECAL commissioning page under development | ||
+ | * Laveen continues working on close-shower separation studies -- FCAL-2 geometry -> Ilya's code | ||
+ | * Physics discussion: | ||
+ | ** Exclusion plots need to be updated (plots from proposal don't reflect our current understanding of the backgrounds) | ||
+ | ** Degree of background suppression needs to be presented carefully in future talks | ||
+ | ** Need to come up with data analysis strategy | ||
+ | ** Make a list of physics channels ranked from "easy" to hard |
Latest revision as of 10:00, 7 October 2024
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- - 5 (12 x 4) and 5 (6 x 8) boards have been received. Received all PCB boards. Soldering wires to connectors (one distribution board is ready, one more board will be ready during next week)
- - Sent out request of quotes for HV board boxes
- - Consider to build temporarry boxes for testing
- - Two panels for the LV distribution boards received, need to re-connect cables (Sasha, Laveen, Vlad) [3]
Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
- Installation of the light distribution board of the ECAL LMS [4]
- - Fine-tune the light source
- Implementing ECAL into the GlueX DAQ [5]
- - rocecal3 crate was fixed [6] (initial DAQ implementation [7])
- - implementing flash ADC scalers [8]
- - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [9]
- - implementing and verifying ECAL LMS trigger [10]
- - implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [11]
- - Installation of scintillating paddles for cosmic tests [12]
- Detector installation page
- Safety briefings
- Meeting with Drew Weisenberger regarding Vlad'd involvement in commissioning
- FCAL2 Engineering Meetings
- Remaining installation tasks
- - Connecting cooling pipes to the ECAL fan (done by tech group)
- - Installing dark room ceiling and insulation inside the room, required for cooling test (next week)
- - Test cooling system (next week)
- - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)
Students -- Sasha
- Zhikun arrived to the lab
Restoring PS test setup [13]
ECAL commissioning -- Sasha, All
Minutes
Attendees: Bill, Sasha, Igal, Vlad, Laveen, Zisis, Ilya, Stjepan, S.T.
- Student from Wuhan has arrived
- HV pcbs arrived, connectors being soldered onto boards, one set ready to go
- Still missing boxes to house these pcbs, plan to build temporary solution
- Position of LV distribution panels lowered, need to be re-cabled
- Need to increase light intensity for LMS
- Prototype light input using 5 LEDs leeds to small amplitudes (~100 mV)
- Would like to increase light intensity 10x
- Many possible solutions considered: tune pulse width? increase number of LEDs? get rid of integrating sphere?
- DAQ commissioning continues
- Translation table for ECAL done, still working on translation table for lead glass
- ECAL low-level scalers from DAQ system working, EPICS scalers still need work
- Can read out digihits for ECAL (read out all 7 ECAL crates) -- flashADC waveforms seen!
- Front panel LMS trigger working, progress on ECAL physics trigger (working, energy sum from signal pulses induced by the LMS)
- However: barely enough CTP (Crate Trigger Processor) modules (no spares)
- Plan to use new type of board for trigger: VXS Trigger Processor (VTP)
- Have 8 VTPs to replace CTPs, installed one
- VTPs need new firmware -- one month needed?
- Cosmic ray setup: installed scintillator paddle below FCAL, will install one above FCAL
- Cooling system installation/testing and dark room ceiling proceeding
- ECAL commissioning page under development
- Laveen continues working on close-shower separation studies -- FCAL-2 geometry -> Ilya's code
- Physics discussion:
- Exclusion plots need to be updated (plots from proposal don't reflect our current understanding of the backgrounds)
- Degree of background suppression needs to be presented carefully in future talks
- Need to come up with data analysis strategy
- Make a list of physics channels ranked from "easy" to hard