Difference between revisions of "JEF meeting, November 1, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 45: | Line 45: | ||
'''Analysis/Simulation''' | '''Analysis/Simulation''' | ||
− | :: | + | ::Zhikun Update[https://halldweb.jlab.org/detectors/fcal2/installation/meetings/11_01_2024] |
<!-- :: [https://halldweb.jlab.org/DocDB/0066/006667/001/Update-Oct17.pdf Laveen Update] --> | <!-- :: [https://halldweb.jlab.org/DocDB/0066/006667/001/Update-Oct17.pdf Laveen Update] --> | ||
''' Presentation at IEEE ''' [https://halldweb.jlab.org/detectors/fcal2/] | ''' Presentation at IEEE ''' [https://halldweb.jlab.org/detectors/fcal2/] | ||
:: Conference trip was not supported by Hall D | :: Conference trip was not supported by Hall D |
Revision as of 09:19, 1 November 2024
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Preparation of parts for ECAL -- Sasha
- - Connectors and cables were installed on the PCBs of 2 HV distribution boards. Sammy and Chris are working on the third board, it will likely be ready during next week (Sammy also works on GEM/TRD)
- - Boxes for HV boards have been just been ordered. Expected delivery date 11/15/2024.
- - Vince P. has machined parts for two temporary distribution boards. Two temporary HV distribution boards were assembled. The holes for connectors were too narrow, the tech group fixed it.
- - Have received all parts for the new version of the LMS light source
Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
- Installation of the light distribution board of the ECAL LMS [3]
- - Vlad P. has slightly modified the design of the LMS light source in order to increase the amount of light. Chris S. is working on a new board with 9 LEDs.
- Implementing ECAL into the GlueX DAQ [4]
- - rocecal3 crate was fixed [5] (initial DAQ implementation [6])
- - implementing flash ADC scalers [7][8][9]
- - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [10]
- - implementing and verifying ECAL LMS trigger [11]
- - implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [12]
- - Start implementing VTP trigger modules. Requires modification of firmware. The trigger crates may be unavailable for 1 - 1.5 months.
- - The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
- Installation of scintillating paddles for cosmic tests [13] [14][15]
- ECAL HV interlock check [16]
- Cable map of the ECAL LG modules after installing ECAL [17]
- Reinstalling cables on the ECAL LV distribution board [18]
- Safety briefings - Vlad, Sasha
- Detector installation page
- Installation of temporary HV distribution boards and testing flash ADC scalers [19][20]
- FCAL2 Engineering Meetings
- Remaining installation tasks
- - Connecting cooling pipes to the ECAL fan (done by tech group)
- - Installing dark room ceiling and insulation inside the room, required for cooling test (almost complete)
- - Test cooling system (in progress, almost complete)
- - Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)
Restoring PS test setup [21]
ECAL commissioning -- Sasha, All
Calibrations
Analysis/Simulation
- Zhikun Update[22]
Presentation at IEEE [23]
- Conference trip was not supported by Hall D