Line 17: Line 17:
 
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928]
 
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928]
 
:: - rocecal3 crate was fixed [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928])
 
:: - rocecal3 crate was fixed [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928])
:: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672][https://logbooks.jlab.org/entry/4320378]
+
:: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672]
 
:: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [https://logbooks.jlab.org/entry/4317904]
 
:: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [https://logbooks.jlab.org/entry/4317904]
 
:: - implementing and verifying ECAL LMS trigger [https://logbooks.jlab.org/entry/4317903]
 
:: - implementing and verifying ECAL LMS trigger [https://logbooks.jlab.org/entry/4317903]
Line 29: Line 29:
 
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/safety.jpg Safety briefings] - Vlad, Sasha
 
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/safety.jpg Safety briefings] - Vlad, Sasha
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
* Installation of temporary HV distribution boards and testing flash ADC scalers [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672]
+
* Installation of temporary HV distribution boards and testing flash ADC scalers [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672][https://logbooks.jlab.org/entry/4320378]
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings]
 
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings]
 
* Remaining installation tasks
 
* Remaining installation tasks
Line 45: Line 45:
 
'''Analysis/Simulation'''
 
'''Analysis/Simulation'''
  
::Zhikun Update[https://halldweb.jlab.org/detectors/fcal2/installation/meetings/11_01_2024]
+
:: Update from Zhikun [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/11_01_2024]
 
<!-- :: [https://halldweb.jlab.org/DocDB/0066/006667/001/Update-Oct17.pdf Laveen Update] -->
 
<!-- :: [https://halldweb.jlab.org/DocDB/0066/006667/001/Update-Oct17.pdf Laveen Update] -->
  
 
''' Presentation at IEEE '''  [https://halldweb.jlab.org/detectors/fcal2/]
 
''' Presentation at IEEE '''  [https://halldweb.jlab.org/detectors/fcal2/]
 
::  Conference trip was not supported by Hall D
 
::  Conference trip was not supported by Hall D
 +
 +
=Minutes=
 +
Attendees: Sasha, Liping, Igal, Xiaolin, Laveen, Olga, Vlad, Phil, Axel, Jane, Zhikun, S.T.
 +
* No news on HV boxes, still expect November 18 delivery
 +
** Using 2 temporary boxes allowing checking 1/2 ECAL
 +
*** Read out flash-ADC scalers using LED light source at 500 Hz
 +
**** Found several holes due to slightly disconnected dividers, now fixed
 +
**** Some problems appear to be due to jostling of chains (maybe need more than velcro to tie together?  Metal rods?)
 +
**** Found swapped cables
 +
**** Found bad connector on PCB
 +
**** One problem with LV distribution: baseline shift
 +
** Checking other 1/2 will have to wait for real HV box/board solution
 +
* Using 2 chillers keeping temperature at 19 C to avoid condensation
 +
** Need to check temperature stability
 +
** Blow air on ECAL dividers
 +
** Will install dehumidier(s)
 +
* LMS: working on increasing light output -- would like to increase 10x
 +
** Considering whether or not we need integrating sphere
 +
** Inject light directly?  Working on alternate solution with small aperture LEDs
 +
* Work to begin on infrastructure for reference PMT + radioactive source
 +
* DAQ: next step is to start reading out waveforms
 +
* Zhikun showed hit occupancy plot for FCAL-2 using simulated muon events
 +
* Discussed plans for beam tests using PS
 +
** 5x5 array lead glass + 5x5 array lead tungstate (have spares, can reuse ComCal box)
 +
** Measure position resolution with 5x5 lead tungstate array?
 +
* Hakob willing to come in January to help maintain detector, maybe work on veto prototype?

Latest revision as of 14:10, 4 November 2024

Connection

Meeting time and location:

Agenda

Preparation of parts for ECAL -- Sasha

  • - HV distribution boards [1][2]
- Connectors and cables were installed on the PCBs of 2 HV distribution boards. Sammy and Chris are working on the third board, it will likely be ready during next week (Sammy also works on GEM/TRD)
- Boxes for HV boards have been just been ordered. Expected delivery date 11/15/2024.
- Vince P. has machined parts for two temporary distribution boards. Two temporary HV distribution boards were assembled. The holes for connectors were too narrow, the tech group fixed it.
- Have received all parts for the new version of the LMS light source

Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Installation of the light distribution board of the ECAL LMS [3]
- Vlad P. has slightly modified the design of the LMS light source in order to increase the amount of light. Chris S. is working on a new board with 9 LEDs.
  • Implementing ECAL into the GlueX DAQ [4]
- rocecal3 crate was fixed [5] (initial DAQ implementation [6])
- implementing flash ADC scalers [7][8]
- translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [9]
- implementing and verifying ECAL LMS trigger [10]
- implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [11]
- Start implementing VTP trigger modules. Requires modification of firmware. The trigger crates may be unavailable for 1 - 1.5 months.
- The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
- Connecting cooling pipes to the ECAL fan (done by tech group)
- Installing dark room ceiling and insulation inside the room, required for cooling test (almost complete)
- Test cooling system (in progress, almost complete)
- Installing HV distribution boards, start switching the detector ON (waiting for HV boxes)

Restoring PS test setup [21]

ECAL commissioning -- Sasha, All

Calibrations

Analysis/Simulation

Update from Zhikun [22]

Presentation at IEEE [23]

Conference trip was not supported by Hall D

Minutes

Attendees: Sasha, Liping, Igal, Xiaolin, Laveen, Olga, Vlad, Phil, Axel, Jane, Zhikun, S.T.

  • No news on HV boxes, still expect November 18 delivery
    • Using 2 temporary boxes allowing checking 1/2 ECAL
      • Read out flash-ADC scalers using LED light source at 500 Hz
        • Found several holes due to slightly disconnected dividers, now fixed
        • Some problems appear to be due to jostling of chains (maybe need more than velcro to tie together? Metal rods?)
        • Found swapped cables
        • Found bad connector on PCB
        • One problem with LV distribution: baseline shift
    • Checking other 1/2 will have to wait for real HV box/board solution
  • Using 2 chillers keeping temperature at 19 C to avoid condensation
    • Need to check temperature stability
    • Blow air on ECAL dividers
    • Will install dehumidier(s)
  • LMS: working on increasing light output -- would like to increase 10x
    • Considering whether or not we need integrating sphere
    • Inject light directly? Working on alternate solution with small aperture LEDs
  • Work to begin on infrastructure for reference PMT + radioactive source
  • DAQ: next step is to start reading out waveforms
  • Zhikun showed hit occupancy plot for FCAL-2 using simulated muon events
  • Discussed plans for beam tests using PS
    • 5x5 array lead glass + 5x5 array lead tungstate (have spares, can reuse ComCal box)
    • Measure position resolution with 5x5 lead tungstate array?
  • Hakob willing to come in January to help maintain detector, maybe work on veto prototype?