Difference between revisions of "JEF meeting, November 22, 2024"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Connection = Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information C...")
 
 
(6 intermediate revisions by one other user not shown)
Line 4: Line 4:
 
*9:30 am EST (JLab time) remote only
 
*9:30 am EST (JLab time) remote only
 
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information]
 
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information]
 +
  
  
Line 9: Line 10:
 
'''Preparation of parts for ECAL''' -- Sasha  
 
'''Preparation of parts for ECAL''' -- Sasha  
  
'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All  
+
:: -Expected delivery date of the ECAL HV distribution boards 11/18/2024 [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg]
 +
:: -Meeting with Fernando and Chris regarding updating the LMS light source, a few new LEDs have been ordered
 +
:: -Four temperature sensors (RTD) were ordered. They will be installed in the ECAL divider region
 +
:: -Tim ordered two additional fans to increase the air flow in the divider region
 +
'''-Installation of the FCAL2 detector & integration to GlueX''' -- Sasha, All  
 +
* Implementing ECAL into the GlueX DAQ [https://logbooks.jlab.org/entry/4316928]
 +
:: - rocecal3 crate was fixed [https://logbooks.jlab.org/entry/4317415] (initial DAQ implementation [https://logbooks.jlab.org/entry/4316928])
 +
:: - implementing flash ADC scalers [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672]
 +
:: - translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [https://logbooks.jlab.org/entry/4317904]
 +
:: - implementing and verifying ECAL LMS trigger [https://logbooks.jlab.org/entry/4317903]
 +
:: - implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [https://logbooks.jlab.org/entry/4317905]
 +
:: - Start implementing VTP trigger modules. Requires modification of firmware. <span style="color:red"> The trigger crates may be unavailable for 1 - 1.5 months.</span>
 +
::: - The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
 +
::: - New version of DAQ, VTP included as a DAQ component [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/11_08_2024/daq_vtp.png]
 +
* Installation of scintillating paddles for cosmic tests [https://logbooks.jlab.org/entry/4317905] [https://logbooks.jlab.org/entry/4318834][https://logbooks.jlab.org/entry/4319535]
 +
* ECAL HV interlock check [https://logbooks.jlab.org/entry/4318704]
 +
* Cable map of the ECAL LG modules after installing ECAL [https://logbooks.jlab.org/entry/4318588]
 +
* Reinstalling cables on the ECAL LV distribution board  [https://logbooks.jlab.org/entry/4318905]
 +
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/safety.jpg Safety briefings] - Vlad, Sasha
 +
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 +
* Commissioning north part of the ECAL (instrumented with 2 temporary HV distribution boards) [https://logbooks.jlab.org/entry/4319280][https://logbooks.jlab.org/entry/4319672][https://logbooks.jlab.org/entry/4320378][https://logbooks.jlab.org/entry/4320977]
 +
* First cosmic event in the ECAL [https://logbooks.jlab.org/entry/4320980]
 +
* Temperature scan in the ECAL divider region [https://logbooks.jlab.org/entry/4320981][https://logbooks.jlab.org/entry/4321406][https://logbooks.jlab.org/entry/4321241][https://logbooks.jlab.org/entry/4321188]
 +
:: Meeting with Tim, additional fans will be installed
 +
* Repairing a few ECAL LMS optical fibers [https://logbooks.jlab.org/entry/4320978][https://logbooks.jlab.org/entry/4321408]
 +
* Preparing for the installation of the insulation on the detector face
 +
:: - Removing Tedlar from the face of the detector [https://logbooks.jlab.org/entry/4321573]
 +
:: - ECAL flash ADC scalers before removing detector face cover [https://logbooks.jlab.org/entry/4321569]
  
 +
* Preparing for the run
 +
:: [https://halldweb.jlab.org/hdops/wiki/index.php/Electromagnetic_Calorimeter Page for shift Takers ]
 +
:: [https://halldweb.jlab.org/detectors/fcal2/esad_safety ECAL in the Experimental Safety Assessment Document (ESAD)]
 +
:: EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)
 +
* [https://halldweb.jlab.org/wiki/index.php/FCAL2_Meetings FCAL2 Engineering Meetings]
 +
* Remaining installation tasks
 +
::  - Installing additional fans
 +
::  - Installing insulation on the detector's face
 
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]  
 
'''Restoring PS test setup''' [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]  
  
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 +
 +
'''Laveen update'''[[https://halldweb.jlab.org/DocDB/0066/006689/001/Nov15-Update.pdf]]
  
 
'''Calibrations'''
 
'''Calibrations'''
 +
 +
::-[https://halldweb.jlab.org/detectors/fcal2/installation/meetings/11_15_2024/2024.11.8-2024.11.14.pdf First look on cosmic data -- Zhikun]
  
 
'''Analysis/Simulation'''
 
'''Analysis/Simulation'''
 +
 +
=Minutes=
 +
Attendees: Sasha, Zhikun, Phil, Bill, Vlad, Jane, Olga, Laveen, Liping, Xiaolin, S.T.
 +
* Final inspection of optical fibers completed, techs put new Tedlar on FCAL face and will install new insulation foam
 +
* Everything looks good on the ECAL north side according to scalers
 +
* Still waiting for HV boxes
 +
* Tests continue to increase LMS light output
 +
** Fernando found brighter LEDs, will test
 +
** Driver modified, added many more LEDS to board (5 -> 25)
 +
** Will still use integrating sphere
 +
* Four more temperature sensors for ECAL divider region ordered
 +
* Two more fans ordered, to be place to left and right of existing assembly
 +
* Laveen working on reference PMT design
 +
* One LV channel needs to be fixed
 +
* Documentation coming together:  ECAL shift page for upcoming run, ECAL in ESAD, ePAS for general maintenance
 +
* Zhikun developed script to create new HV config file based on Amp<->HV curve
 +
** Will use fitted peak positions from cosmic data
 +
* CSS for HV control ready to be tested
 +
* Calibration plans to be discussed next meeting
 +
** Cosmics for initial HV settings
 +
** Compton events
 +
** &pi;0 refinement

Latest revision as of 09:40, 25 November 2024

Connection

Meeting time and location:


Agenda

Preparation of parts for ECAL -- Sasha

-Expected delivery date of the ECAL HV distribution boards 11/18/2024 [1][2]
-Meeting with Fernando and Chris regarding updating the LMS light source, a few new LEDs have been ordered
-Four temperature sensors (RTD) were ordered. They will be installed in the ECAL divider region
-Tim ordered two additional fans to increase the air flow in the divider region

-Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

  • Implementing ECAL into the GlueX DAQ [3]
- rocecal3 crate was fixed [4] (initial DAQ implementation [5])
- implementing flash ADC scalers [6][7]
- translation table for the ECAL (finalize/check translation DB, generate xml file, import to the CCDB) - done [8]
- implementing and verifying ECAL LMS trigger [9]
- implementing and verifying the ECAL physics trigger. First event reconstructed using the GlueX software [10]
- Start implementing VTP trigger modules. Requires modification of firmware. The trigger crates may be unavailable for 1 - 1.5 months.
- The VTP was installed in the D2-1-TOP crate, IP address assigned, and can be booted now
- New version of DAQ, VTP included as a DAQ component [11]
Meeting with Tim, additional fans will be installed
  • Repairing a few ECAL LMS optical fibers [27][28]
  • Preparing for the installation of the insulation on the detector face
- Removing Tedlar from the face of the detector [29]
- ECAL flash ADC scalers before removing detector face cover [30]
  • Preparing for the run
Page for shift Takers
ECAL in the Experimental Safety Assessment Document (ESAD)
EPAS for Maintenance of the Hall D ECAL (Jlab-PTW-5236)
- Installing additional fans
- Installing insulation on the detector's face

Restoring PS test setup [31]

ECAL commissioning -- Sasha, All

Laveen update[[32]]

Calibrations

-First look on cosmic data -- Zhikun

Analysis/Simulation

Minutes

Attendees: Sasha, Zhikun, Phil, Bill, Vlad, Jane, Olga, Laveen, Liping, Xiaolin, S.T.

  • Final inspection of optical fibers completed, techs put new Tedlar on FCAL face and will install new insulation foam
  • Everything looks good on the ECAL north side according to scalers
  • Still waiting for HV boxes
  • Tests continue to increase LMS light output
    • Fernando found brighter LEDs, will test
    • Driver modified, added many more LEDS to board (5 -> 25)
    • Will still use integrating sphere
  • Four more temperature sensors for ECAL divider region ordered
  • Two more fans ordered, to be place to left and right of existing assembly
  • Laveen working on reference PMT design
  • One LV channel needs to be fixed
  • Documentation coming together: ECAL shift page for upcoming run, ECAL in ESAD, ePAS for general maintenance
  • Zhikun developed script to create new HV config file based on Amp<->HV curve
    • Will use fitted peak positions from cosmic data
  • CSS for HV control ready to be tested
  • Calibration plans to be discussed next meeting
    • Cosmics for initial HV settings
    • Compton events
    • π0 refinement