Line 12: | Line 12: | ||
# Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM) | # Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM) | ||
− | # Will to update statement of work for USM contract and develop detailed schedule. | + | # <strike> Will to update statement of work for USM contract and develop detailed schedule. </strike> Draft in progress. |
= Documents to Review= | = Documents to Review= | ||
Line 25: | Line 25: | ||
# Geometry and light guides | # Geometry and light guides | ||
# Simulation runs | # Simulation runs | ||
− | |||
= Minutes = | = Minutes = | ||
+ | Attendees:Beni, John, Elton, Tim, Fernando, Eugene, Yi (JLab); Zisis (UofR); Will (USM) | ||
+ | |||
+ | # Announcements | ||
+ | #* Report on calibration from Athens scheduled for next Thu at the cal working group meeting. | ||
+ | # Review of Action Items | ||
+ | # Update - USM | ||
+ | #* Will has started drafting a sow, beginning with clearly defining the division of responsibilities between JLab and USM. Preliminary notes in the form of a table listing the tasks have been sent to Elton for feedback. | ||
+ | # [[SiPM Radiation Hardness Test]] (Update from Yi) | ||
+ | #* Samples have been irradiated at different temperatures, and they are in the recovery phase. | ||
+ | #* Recovery is strongly temperature dependent, with recovery at 60 degrees almost complete after a couple of days. Recover at 0deg very slow, no change in the same time period. | ||
+ | #* Preliminary conclusions: recovery is about as expected; gain by cooling 15 deg is 2.6 vs 3.1. | ||
+ | # Electronics/cooling | ||
+ | # Geometry and light guides | ||
+ | # Simulation runs |
Latest revision as of 14:19, 24 September 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC L207 is 757-269-7084
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM)
-
Will to update statement of work for USM contract and develop detailed schedule.Draft in progress.
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- SiPM Radiation Hardness Test (Update from Yi)
- Electronics/cooling
- Geometry and light guides
- Simulation runs
Minutes
Attendees:Beni, John, Elton, Tim, Fernando, Eugene, Yi (JLab); Zisis (UofR); Will (USM)
- Announcements
- Report on calibration from Athens scheduled for next Thu at the cal working group meeting.
- Review of Action Items
- Update - USM
- Will has started drafting a sow, beginning with clearly defining the division of responsibilities between JLab and USM. Preliminary notes in the form of a table listing the tasks have been sent to Elton for feedback.
- SiPM Radiation Hardness Test (Update from Yi)
- Samples have been irradiated at different temperatures, and they are in the recovery phase.
- Recovery is strongly temperature dependent, with recovery at 60 degrees almost complete after a couple of days. Recover at 0deg very slow, no change in the same time period.
- Preliminary conclusions: recovery is about as expected; gain by cooling 15 deg is 2.6 vs 3.1.
- Electronics/cooling
- Geometry and light guides