Difference between revisions of "PrimEx-eta Short Term Run Plan"
(→Run conditions) |
(→Last updated) |
||
(33 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Last updated == | == Last updated == | ||
− | + | 28 August, by PrimEx-eta group | |
== Current Experiment == | == Current Experiment == | ||
Line 10: | Line 10: | ||
== Notes == | == Notes == | ||
* All GlueX detectors except DIRC | * All GlueX detectors except DIRC | ||
− | * | + | * Plus, a calorimeter (CCAL) 4 m downstream FCAL to cover polar between 0.2 and 1 degree and measure Compton events in combination with FCAL. |
== Run conditions == | == Run conditions == | ||
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room whiteboard] | [https://halldweb.jlab.org/online/whiteboard/ Hall D counting room whiteboard] | ||
− | * Radiator 10 | + | * Radiator (Amorphous) 10 µm Al (2 x 10-5 RL) |
* Collimator 5 mm | * Collimator 5 mm | ||
− | * TPOL converter Be 750 | + | * TPOL converter Be 750 µm |
− | + | * Runs are no more than 2 hours - see whiteboard for the production cycle | |
− | + | * Targets, currently Empty Be target IN | |
− | * Runs are no more than 2 hours - see whiteboard for production cycle | + | ** 4He target: cryogenic target (OUT) |
− | + | ** Empty 4He target (OUT) | |
− | * | + | ** Be target (OUT) |
− | * | + | ** Empty Be target (IN) |
− | + | ||
DAQ config | DAQ config | ||
− | * | + | * Setup: TBA |
− | * | + | * Production: TBA |
− | * ( | + | * (Raw mode: config TBA) |
== Run plan == | == Run plan == | ||
− | See the daily plan in [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings: | + | See the daily plan in [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2022 Run Coordination Meetings:Fall2022] and also the [https://halldweb.jlab.org/online/whiteboard/ counting house whiteboard] |
== Shift duties == | == Shift duties == | ||
− | GlueX Guidelines are at [ | + | GlueX Guidelines are at [https://halldweb.jlab.org/hdops/wiki/index.php/Shift_Guidelines_for_Shift_Leader Shift Guidelines for_Shift Leader] and [https://halldweb.jlab.org/hdops/wiki/index.php/Guidelines_for_Remote_Worker_Shift Guidelines for Remote Worker Shift] |
− | === | + | === Run comments === |
− | Put information, eg "production | + | Put information, eg "production 200 nA He", in the run comments window of the DAQ. The comments are needed for RCDB. |
− | The run comments window should appear automatically after a run has been started. Enter comments and SAVE, do not exit. If the run comments window is visible, check first whether it is hiding eg on the upper | + | The run comments window should appear automatically after a run has been started. Enter comments and SAVE, do not exit. If the run comments window is visible, check first whether it is hiding eg on the upper workspace. If it is not up, restart the DAQ before the start of the next run. |
− | === | + | === List of production runs === |
* Include a separate list of the runs taken during the shift at the end of the shift leader summary | * Include a separate list of the runs taken during the shift at the end of the shift leader summary | ||
* Please include the following: | * Please include the following: | ||
− | *:run number, start & stop times, beam current, | + | *:run number, start & stop times, beam current, Be or He4 target / no target/empty target, radiator, daq configuration, daq event rate, daq livetime, number of events, production/test/junk/any_other_comment |
=== BTA sheet === | === BTA sheet === | ||
Line 56: | Line 55: | ||
** '''UED:''' unplanned experiment down (hardware failure) | ** '''UED:''' unplanned experiment down (hardware failure) | ||
− | === | + | === Strip charts === |
* Log the '''strip charts''' of beam current and position, see [[Slow_Controls_Shift#MYA_Archiver]] | * Log the '''strip charts''' of beam current and position, see [[Slow_Controls_Shift#MYA_Archiver]] | ||
− | ** | + | ** On a gluon machine type myaPlot |
− | ** | + | ** Right-click on the blank space of the myaPlot screen and select "Clone in new LivePlot" |
− | ** | + | ** Right-click on the screen and select "Load a Configuration" |
− | ** | + | ** The configuration "beam_conditions" provides the beam current and position information |
− | ** | + | ** Right-click on the screen and select '''"Make Elog Entry"''', make sure you do not log to ELOG but to '''HDLOG'''. |
− | === | + | === Data monitoring plots === |
− | + | Log per run, [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift Online Monitoring Shift] | |
=== screen shot of CSS GlueX Overview === | === screen shot of CSS GlueX Overview === | ||
− | + | Log per run, [[Slow_Controls_Shift#EPICS_Control_Screens]] , also see [https://halldweb.jlab.org/hdops/wiki/index.php/Logbook_Screenshot_Tool screenshot tool for making E-log entries] | |
− | === | + | === Shift checklist === |
− | + | Log per shift, [https://halldweb.jlab.org/hdops/wiki/index.php/Shift_Checklist Shift Checklist] | |
== Special instructions == | == Special instructions == | ||
Line 85: | Line 84: | ||
=== After beam restoration === | === After beam restoration === | ||
− | * | + | * See [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Collimator_and_Radiators Beam Line Detectors Shift / Collimator and Radiators] on how to move radiators and collimator |
− | * | + | * Check the '''radiation levels''' without the radiator and then with the radiator |
− | ** | + | ** See the whiteboard (bottom RHS corner of the RH board) - there are columns of values expected without and with the radiator |
− | * ''' | + | * '''Retract the radiator''' |
− | * ''' | + | * '''Collimator in blocking position''' |
− | * | + | * Ask MCC to do their harp scan |
− | * | + | * Our '''harp scans''': follow the instructions in [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan Beam Line Detectors Shift/Radiator Harp Scan] |
− | * | + | * Use the '''harp scan extrapolation''' tool [http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi] and post screenshots of the plots into the logbook (eg https://logbooks.jlab.org/entry/3929556). |
=== Target status === | === Target status === | ||
− | * | + | * Check camera west-cam.jlab.org, select Target view, if necessary |
− | + | ||
− | + | ||
− | === | + | === Rootspy === |
− | If you have to restart rootspy, [ | + | If you have to restart rootspy, [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift#Routine_Operation Online Monitoring Shift/Routine Operation], and it crashes, you might have to restart the monitoring process, find help at [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift#Starting_and_stopping_the_Monitoring_System Online Monitoring Shift/Starting and stopping the Monitoring System]. |
=== DAQ issues === | === DAQ issues === | ||
− | Call the expert. In case they suggest that you restart the DAQ, find information at [ | + | Call the expert. In case they suggest that you restart the DAQ, find information at [https://halldweb.jlab.org/hdops/wiki/index.php/Data_Acquisition_Shift Data Acquisition Shift]. |
=== Timing problems === | === Timing problems === |
Latest revision as of 14:54, 28 August 2022
Contents
Last updated
28 August, by PrimEx-eta group
Current Experiment
Measure the η-meson radiative decay width (η -> γγ)
- Experiment number: E12-10-011 (use in BTA shift information)
- Proposal: PAC link
- Spokesperson: Ashot Gasparian
Notes
- All GlueX detectors except DIRC
- Plus, a calorimeter (CCAL) 4 m downstream FCAL to cover polar between 0.2 and 1 degree and measure Compton events in combination with FCAL.
Run conditions
Hall D counting room whiteboard
- Radiator (Amorphous) 10 µm Al (2 x 10-5 RL)
- Collimator 5 mm
- TPOL converter Be 750 µm
- Runs are no more than 2 hours - see whiteboard for the production cycle
- Targets, currently Empty Be target IN
- 4He target: cryogenic target (OUT)
- Empty 4He target (OUT)
- Be target (OUT)
- Empty Be target (IN)
DAQ config
- Setup: TBA
- Production: TBA
- (Raw mode: config TBA)
Run plan
See the daily plan in Run Coordination Meetings:Fall2022 and also the counting house whiteboard
Shift duties
GlueX Guidelines are at Shift Guidelines for_Shift Leader and Guidelines for Remote Worker Shift
Run comments
Put information, eg "production 200 nA He", in the run comments window of the DAQ. The comments are needed for RCDB.
The run comments window should appear automatically after a run has been started. Enter comments and SAVE, do not exit. If the run comments window is visible, check first whether it is hiding eg on the upper workspace. If it is not up, restart the DAQ before the start of the next run.
List of production runs
- Include a separate list of the runs taken during the shift at the end of the shift leader summary
- Please include the following:
- run number, start & stop times, beam current, Be or He4 target / no target/empty target, radiator, daq configuration, daq event rate, daq livetime, number of events, production/test/junk/any_other_comment
BTA sheet
- The BTA guidelines are at BTA_guidelines.
After loading the EPICS values, you may change the values, eg round them up or down.- BANU values >= 5 minutes must be reflected in the PCC value (else the aftermath doesnt work out for RC)
- BANU values < 5 minutes may be set to 0
- UED: unplanned experiment down (hardware failure)
Strip charts
- Log the strip charts of beam current and position, see Slow_Controls_Shift#MYA_Archiver
- On a gluon machine type myaPlot
- Right-click on the blank space of the myaPlot screen and select "Clone in new LivePlot"
- Right-click on the screen and select "Load a Configuration"
- The configuration "beam_conditions" provides the beam current and position information
- Right-click on the screen and select "Make Elog Entry", make sure you do not log to ELOG but to HDLOG.
Data monitoring plots
Log per run, Online Monitoring Shift
screen shot of CSS GlueX Overview
Log per run, Slow_Controls_Shift#EPICS_Control_Screens , also see screenshot tool for making E-log entries
Shift checklist
Log per shift, Shift Checklist
Special instructions
Hall Delta
It's good practice to refer to our hall as Delta when talking to MCC, to make sure that there is no acoustic confusion between us and Hall B.
After beam restoration
- See Beam Line Detectors Shift / Collimator and Radiators on how to move radiators and collimator
- Check the radiation levels without the radiator and then with the radiator
- See the whiteboard (bottom RHS corner of the RH board) - there are columns of values expected without and with the radiator
- Retract the radiator
- Collimator in blocking position
- Ask MCC to do their harp scan
- Our harp scans: follow the instructions in Beam Line Detectors Shift/Radiator Harp Scan
- Use the harp scan extrapolation tool http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi and post screenshots of the plots into the logbook (eg https://logbooks.jlab.org/entry/3929556).
Target status
- Check camera west-cam.jlab.org, select Target view, if necessary
Rootspy
If you have to restart rootspy, Online Monitoring Shift/Routine Operation, and it crashes, you might have to restart the monitoring process, find help at Online Monitoring Shift/Starting and stopping the Monitoring System.
DAQ issues
Call the expert. In case they suggest that you restart the DAQ, find information at Data Acquisition Shift.
Timing problems
If there are any, please add sdobbs@jlab.org to the notifications in the logbook entry.
Example double timing peaks: https://logbooks.jlab.org/entry/3933110