Difference between revisions of "JEF meeting, October 7, 2022"
From GlueXWiki
(→Agenda) |
|||
(4 intermediate revisions by one other user not shown) | |||
Line 6: | Line 6: | ||
* Simulations/Analysis | * Simulations/Analysis | ||
− | ** Received | + | * Preparation of parts for FCAL2 modules -- Sasha |
− | + | ** Received 40 CRYTUR crystals from Physics Division[https://halldweb.jlab.org/wiki-private/index.php/PMT_for_FCAL_insert] | |
− | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 717 (10 since last week) ] | |
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: | + | *** Available for wrapping: 762 - 717 = 45 |
− | *** Available for wrapping: | + | |
*** DSG group continues wrapping | *** DSG group continues wrapping | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total | + | ** Fabricated modules: <span style="color:#FF0000"> Total 1291 </span> (44 modules fabricated since last week) |
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
− | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf | + | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 715 CRYTUR], available: 47 |
* Updates from the FCAL installation meetings with Tim's group -- Sasha | * Updates from the FCAL installation meetings with Tim's group -- Sasha | ||
− | ** [https://halldweb.jlab.org/wiki/index.php/ | + | ** [https://halldweb.jlab.org/wiki/index.php/October_05,_2022_FCAL_Insert_Installation_Meeting October 5] |
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Phil, Arshak, Igal, Liping, Sasha, Zisis, Azizah, Jane, Tim B., S.T. | ||
+ | * Phil will give a talk at the upcoming DNP meeting to highlight all the work done by the students during the summer | ||
+ | * Received 40 lead tungstate crystals from physics division, out of 150 | ||
+ | * 60 more crystals to come | ||
+ | * Wrapping continues, 45 to go of crystals in house | ||
+ | * Fabricated module grand total = 1291 | ||
+ | ** 100 more modules to be assembled by the end of the year | ||
+ | ** Have enough PMT housings for all available crystals, full set within 1-2 months | ||
+ | ** Light guides almost complete | ||
+ | ** Brass straps ordered, still waiting | ||
+ | * Installation meetings: Sasha will present plans + manpower estimates | ||
+ | ** FCAL frame under construction | ||
+ | ** Cabling, patch panels, etc. under discussion | ||
+ | ** Have most electronics, need to order crate trigger processors | ||
+ | *LMS: need to check FCAL plexiglas -- will it need to be replaced? |
Latest revision as of 13:15, 11 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Received 40 CRYTUR crystals from Physics Division[1]
- Wrapped CRYTUR crystals: 717 (10 since last week)
- Available for wrapping: 762 - 717 = 45
- DSG group continues wrapping
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1291 (44 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 715 CRYTUR, available: 47
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Preparation of parts for FCAL2 modules -- Sasha
- Light Monitoring System -- Arshak
Minutes
Attendees: Phil, Arshak, Igal, Liping, Sasha, Zisis, Azizah, Jane, Tim B., S.T.
- Phil will give a talk at the upcoming DNP meeting to highlight all the work done by the students during the summer
- Received 40 lead tungstate crystals from physics division, out of 150
- 60 more crystals to come
- Wrapping continues, 45 to go of crystals in house
- Fabricated module grand total = 1291
- 100 more modules to be assembled by the end of the year
- Have enough PMT housings for all available crystals, full set within 1-2 months
- Light guides almost complete
- Brass straps ordered, still waiting
- Installation meetings: Sasha will present plans + manpower estimates
- FCAL frame under construction
- Cabling, patch panels, etc. under discussion
- Have most electronics, need to order crate trigger processors
- LMS: need to check FCAL plexiglas -- will it need to be replaced?