Difference between revisions of "JEF meeting, September 6, 2024"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...")
 
 
(21 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
=Agenda=
 
=Agenda=
  
*'''Preparation of parts for ECAL''' -- Sasha  
+
'''Preparation of parts for ECAL''' -- Sasha  
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
+
* - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left
* '''Students''' -- Sasha
+
* - HV distribution boards  [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/hv_board2.jpg]
* '''Beam tests with the PS'''
+
::  - 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
* '''Other hardware projects'''
+
::  - Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
*'''Analysis/Simulation'''
+
* - Fix front panel of two LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/lv_board1.jpg]
 +
:::  - new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables
 +
* - LED: Started testing the prototype of the LMS (need to make the detector room light tight)
 +
'''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 +
* Installation and testing dividers has been completed [https://logbooks.jlab.org/entry/4316213]
 +
:: - need to arrange cables on chains
 +
:: - need to arrange cables on cable trays
 +
* [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 +
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
 +
'''Students''' -- Sasha
 +
* - Expect one student from Wuhan, waiting for the US visa
 +
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 +
 
 +
'''Beam tests with the PS'''
 +
*   measure shower beam profile and reconstruction in the crystal/LG transition region
 +
*  (install prototype with 5x5 PbWO4 modules  + ? LG)
 +
'''Other hardware projects'''
 +
* prototype of the ECAL veto counter (?)
 +
'''Analysis/Simulation'''
 +
** [https://halldweb.jlab.org/wiki/images/2/22/Sept-6-Status-Update.pdf Update from Laveen]

Latest revision as of 08:51, 6 September 2024

Meeting time and location:

Agenda

Preparation of parts for ECAL -- Sasha

  • - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left
  • - HV distribution boards [1][2]
- 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
- Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
  • - Fix front panel of two LV distribution boards [3]
- new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables
  • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)

Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen

  • Installation and testing dividers has been completed [4]
- need to arrange cables on chains
- need to arrange cables on cable trays

Students -- Sasha

  • - Expect one student from Wuhan, waiting for the US visa

ECAL commissioning -- Sasha, All

Beam tests with the PS

  • measure shower beam profile and reconstruction in the crystal/LG transition region
  • (install prototype with 5x5 PbWO4 modules + ? LG)

Other hardware projects

  • prototype of the ECAL veto counter (?)

Analysis/Simulation