Line 61: Line 61:
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Radiators:  
 
* Radiators:  
**Goniometer radiators: Start with JD70-107. Next, JD70-109. JD70-103 may still be usable if needed. <font color="red">TBD: Install one of the thick 80μm new diamonds, to be available for opportunistic tests.</font>
+
**Goniometer radiators: Start with JD70-107. Next, JD70-109. JD70-103 may still be usable if needed. <font color="red">TBD: Install two thick 80μm new diamonds, to be available for opportunistic tests.</font>
 
***Diamond <font color="blue">JD70-107 </font>(55 μm - 4.6&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;)  New crystal. (Not expected to be great according to rocking curve.)   
 
***Diamond <font color="blue">JD70-107 </font>(55 μm - 4.6&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;)  New crystal. (Not expected to be great according to rocking curve.)   
 
***Diamond <font color="blue">JD70-109 </font> (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2; - New crystal - (Not expected to be good according to rocking curve.)
 
***Diamond <font color="blue">JD70-109 </font> (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2; - New crystal - (Not expected to be good according to rocking curve.)
 
***Diamond JD70-103 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) Used in CPP. Partly spent.
 
***Diamond JD70-103 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) Used in CPP. Partly spent.
 
***(Diamond JD70-106  (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.)
 
***(Diamond JD70-106  (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.)
***<s>(Diamond JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Spent: used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020/Fall 2021) </s>
+
***(Diamond JD80-212  (80 μm - 6.6&middot;10<sup>-4</sup> R.L., 8&times;8 mm&sup2;) - To be tested.)
 +
***(Diamond JD80-213  (80 μm - 6.6&middot;10<sup>-4</sup> R.L., 8&times;8 mm&sup2;) - To be tested.)
 +
***<s>(Diamond JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Spent: used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020/Fall 2021) </s> <font color="red">To be removed in January</font>
 
***Amorphous 40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)   
 
***Amorphous 40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)   
 
***Amorphous  1.86&middot;10<sup>-5</sup> R.L., (for TAC run).
 
***Amorphous  1.86&middot;10<sup>-5</sup> R.L., (for TAC run).
Line 86: Line 88:
 
* Miscellaneous:
 
* Miscellaneous:
 
** PS test area. Tests must be fully opportunistic,without interfering with ECal commissioning and GlueX data taking. No more than 3 persons involved in such tests should be in the Hall during a control access:   
 
** PS test area. Tests must be fully opportunistic,without interfering with ECal commissioning and GlueX data taking. No more than 3 persons involved in such tests should be in the Hall during a control access:   
***
+
***Presentations this Friday (01/17/2025):
 +
****Future plans for tests - Tanja Horn/Yulia Furletova
 +
****[https://halldweb.jlab.org/wiki/images/7/7c/Yezhenyu_JLab_20250117.pdf AC-LGAD (Low Gain Avalanche Diode) silicone strip detector setup - Zhenyu Ye]
 +
****ZDC (zero degree calorimeter) SiPM-on-Tile setup - Miguel Arratia
  
 
==General Information==
 
==General Information==
Line 92: Line 97:
 
This document describes the run plan for the Hall D Spring 2025 run.  
 
This document describes the run plan for the Hall D Spring 2025 run.  
 
* Schedule for the run (see [https://www.jlab.org/sites/default/files/user-liaison/files/DRAFT-Updated-Schedule-13Aug2024.xlsx 2025 official schedule (draft)]):
 
* Schedule for the run (see [https://www.jlab.org/sites/default/files/user-liaison/files/DRAFT-Updated-Schedule-13Aug2024.xlsx 2025 official schedule (draft)]):
# January <font color="red">TBD</font>: Electron beam restoration.  
+
# February or March <font color="red">TBD</font>: Electron beam restoration.  
# January 24th - July 20th: 26 weeks for upgraded ECal commissioning and GlueX-II/JEF. <font color="red">  As of 11/20/24, one or two weeks shift is expected ⇒ January 31st - July 27th: </font>
+
# January 24th - July 20th: 26 weeks for upgraded ECal commissioning and GlueX-II/JEF. <font color="red">  As of 01/14/25, a 5 to 7 weeks shift is expected ⇒ March. 1st - Aug. 24th: </font>
  
 
* Accelerator overall plan and priorities: Deliver physics beam to 4 halls  
 
* Accelerator overall plan and priorities: Deliver physics beam to 4 halls  
Line 125: Line 130:
 
**The Run Coordinator oversees the run:  
 
**The Run Coordinator oversees the run:  
 
*** Jan. ?? - ??, ?? days (beam restoration): Alexandre Deur  
 
*** Jan. ?? - ??, ?? days (beam restoration): Alexandre Deur  
*** <s>Jan. 24 - 29, 6 days: Alexandre Deur </s>
+
*** <s>Jan. 24 - 29, 6 days: Alexandre Deur  
 
*** Jan. 29 - Feb. 5, 1 week: Igal Jaegle
 
*** Jan. 29 - Feb. 5, 1 week: Igal Jaegle
*** Feb. 5-12, 1 week:  Simon Taylor
+
*** Feb. 5-12, 1 week:  Simon Taylor </s>
 
*** Feb. 12-19, 1 week: Edmundo Barriga
 
*** Feb. 12-19, 1 week: Edmundo Barriga
 
*** Feb. 19-26, 1 week: Colin Gleason
 
*** Feb. 19-26, 1 week: Colin Gleason
Line 277: Line 282:
 
#Long mode 10 min run. Once a week (20 min).
 
#Long mode 10 min run. Once a week (20 min).
 
#Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min.  time to switch from unpol. to pol.: 30min. -->
 
#Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min.  time to switch from unpol. to pol.: 30min. -->
 +
<!-- Right after beam shutdown: From Simon's reconstruction analysis, do we need to resurvey the Start Counter once the target cart is pulled out? Any other after-run survey required? -->
  
 
== Hall D situation room (current run plan) ==
 
== Hall D situation room (current run plan) ==
Line 299: Line 305:
 
<!--<strike></strike> -->
 
<!--<strike></strike> -->
 
*Solenoid (Tim/Eugene/Beni/Scott):  
 
*Solenoid (Tim/Eugene/Beni/Scott):  
**Solenoid is cold and full with LHe. Power supply and solenoid operation checked out in progress.
+
**Solenoid is cold, full with LHe and tested to 825A. Waiting to be closer to the start of the run (when the Hall is in Controlled Access) to test it to full current. Check-out done as far as it can be.
 
*Surveys (Tim/Scott)
 
*Surveys (Tim/Scott)
 
**Surveys yet to be finalized or TBD:
 
**Surveys yet to be finalized or TBD:
***ToF
+
***<strike>ToF done</strike>
***May need to redo the goniometer survey if we install a 80 μm diamond.
+
***Need to redo the goniometer survey after we install two 80 μm diamonds. (Next week)
 
***PS may need to be redone.
 
***PS may need to be redone.
***DIRC
+
***<strike>DIRC. Done on 01/14</strike> Dark cover being installed today (01/15)
 
***Beam pipe
 
***Beam pipe
 +
***<strike>GEM Done on 01/09</strike>
 
***Luminosity monitor
 
***Luminosity monitor
 +
***<strike>Target and Start Counter. Done </strike>
 
*DAQ (Sergei).  
 
*DAQ (Sergei).  
**Sergei is reconfiguring the DAQ step by step because the old software is not supported anymore. It should be finished soon.  
+
**<strike>Every component of the DAQ are tested and working individually.</strike>
 +
**<strike>Beam helicity module has been inserted.</strike>
 +
**Need to test RCDB.
 +
**New version of CODA available: Will need to be tested (Sacha).  
 
*Trigger (Alex Somov).
 
*Trigger (Alex Somov).
**List of triggers to be used for checkout/tests during ECal commissioning:
+
** Initial implementation of the VTP firmware. All 6 VTPs now installed in VXS crates of ECal and configured. Started testing the trigger. All individual crates are generating triggers. Now, need to test how the operate together. May be able to start testing next week with cosmics. It will then need to be integrated in DAQ (old and new version of CODA).
***BCAL cosmic M9 and M10  - the sooner, the better
+
***BCAL_FCAL M9 and M10  - when we have beam. For CDC HV scan (Naomi). As we have not used the CDC for so long, Naomi is concerned that something might have changed in the gas system, particularly the mass flow controllers. need to verify that we are getting the intended gas mix as early as possible, so that if there is something wrong, it can be fixed in time.  
+
 
*Beam line  
 
*Beam line  
 
**Diamond status (Tim/Hovanes).  
 
**Diamond status (Tim/Hovanes).  
***Install one of the thick 80μm new diamonds.  
+
***Two thick 80μm new diamonds (JD80-212, JD80-213) have been now glued and sent to JLab. The were received and will be install this week (Jan 13-17).
***Remove spent diamond JD70-105 for anneal tests at U.Conn. Richard needs to glue it to its holders. Need to have it before mid-January.
+
***Need to remove spent diamond JD70-105 for anneal tests at U.Conn. Next week (Jan 20-24).
 +
***Richard is glueing new 80μm diamonds (which ones?) to their holders. They will be sent soon to JLab.  
 
***Putting new diamond and/or removing mounted diamond ⇒ re-surveying the goniometer. (Presumably, after mid-January.)
 
***Putting new diamond and/or removing mounted diamond ⇒ re-surveying the goniometer. (Presumably, after mid-January.)
 
**<strike>Tagger magnet
 
**<strike>Tagger magnet
 
***Ready and NMR is working.</strike>
 
***Ready and NMR is working.</strike>
 
**Tagger hodoscope (A. Somov).  
 
**Tagger hodoscope (A. Somov).  
 +
***TBD
 
**Tagger microscope (R. Jones/Igal).
 
**Tagger microscope (R. Jones/Igal).
 +
***TBD
 
**Goniometer (Hovanes).  
 
**Goniometer (Hovanes).  
 
***Removed from beamline and reinstalled ⇒ all diamond alignments will need to be redone.
 
***Removed from beamline and reinstalled ⇒ all diamond alignments will need to be redone.
Line 333: Line 345:
 
**Halo monitors (Hovanes)
 
**Halo monitors (Hovanes)
 
**Pair Spectrometer (Alex Somov)  
 
**Pair Spectrometer (Alex Somov)  
 +
***Tested with Cosmics. There is a couple of dead channels. Fernando and Chris will look into fixing one of them (we can live without the other channel).
 
**Polarimeter (Beni/M. Dugger).
 
**Polarimeter (Beni/M. Dugger).
***Detector is operational, Voltages were applied and signals observed. M. Dugger will do a complete checkout Jan 4 to 10.
+
***Detector is operational, Voltages were applied and signals observed. M. Dugger had planned to come on Jan 24-26 to do a complete checkout but this may be a problem because LO/TO is needed and cannot be easilly done on week-end. Tim, Scot, Beni and M. Dugger are looking into a solution. (The ePAS is ready.)
 
**LH2 Target (Tim/A. Deur)  
 
**LH2 Target (Tim/A. Deur)  
***Surveyed. Target group is working on making electrical powering system compatible with new regulation.
+
***<strike>Surveyed and ready.</strike>
 
**TAC (Alex Somov).
 
**TAC (Alex Somov).
 +
***Assembled, tested and surveyed. Will be cabled on Jan. 16 or 17. 
 
**Slow control (Hovanes).  
 
**Slow control (Hovanes).  
***Lots of work to be done. Need ECal hardware (temperature sensor, High Voltage equipment) to be finalized before to start Slow Control work on it.
+
***Lots of work to be done. Need ECal hardware (temperature sensor, High Voltage equipment) to be finalized before to start Slow Control work on it. Need also to do some test with DIRC. Justin: it is ready for these tests.
 
**RF (Sergei)
 
**RF (Sergei)
***Need to wait for the cables to be reconnected. Will be checked sometimes in January.  
+
***Need to wait for the cables to be reconnected, which can be done only after the DIRC is placed in position and surveyed (this should be done by now).  
 
**Radiation monitors (A. Deur)
 
**Radiation monitors (A. Deur)
 
**<strike>x-ray W shield (Tim).</strike>
 
**<strike>x-ray W shield (Tim).</strike>
Line 348: Line 362:
 
***Operational, everything look good.   
 
***Operational, everything look good.   
 
**FDC (Lubomir).
 
**FDC (Lubomir).
***Chiller is now operational.
+
***Chiller is now operational. <strike>The issue with its interlock (rather, the communication box) is gone. </strike>
***At nominal HV, but two sectors are not quite operational. Need to have BCal trigger to test it with cosmics.
+
***Of the two flash-ADC that were not communicating, one is now fixed and for the other it will be replaced by one borrowed from the TRD.
**CDC (Lubomir/Naomi/Beni).
+
***Looking at cosmic data.
***Looking good so far. Also need to have BCal trigger to test.
+
**CDC (Naomi/Lubomir/Beni).
 +
***Earlier assessment of readiness were done too long ago (December). It will be good to recheck readiness. Will take more cosmics data.
 +
***One channel has a bit missing. May need to borrow a fADC module from the TRD.
 
**Gas system (Beni/Lubomir)
 
**Gas system (Beni/Lubomir)
 
***Looking good.
 
***Looking good.
 
**BCal (Mark Dalton/Malte)  
 
**BCal (Mark Dalton/Malte)  
***Waiting on trigger and working DAQ to test.
+
***Detector appears functional. Ready to start the HCO. Need 3 periods of 4h when DAQ is available. Mark is coordinating this with Sasha.
 
**ECal (Sasha)  
 
**ECal (Sasha)  
*** Waiting for the installation of new fans
+
*** Ecal was powered-up during Xmas break and a large sample of cosmic data were taken. They look good and all channels are working. Next step is to equalize gains and start calibration. Once realistic HV are implemented, Sasha will start taking cosmics data.
*** The first HV distribution panel has been installed [https://logbooks.jlab.org/entry/4323021], three more to come
+
***ECal temperature:
*** For temperature sensors have to be installed (included into the interlock), could run the detector over night after that
+
**** Installed 3 temperature sensors. ECal temperatures are now in the monitoring and interlock systems.
*** Including ECAL fan into the interlock (?)
+
**** There is a significant temperature rise when the High Voltage are turned on. The ECal crystals are very temperature-sensitive, so this may impact the ECal calibration.
*** Waiting for the trigger firmware
+
**** To minimize the temperature issue, Sacha will try to increase/add air flow from cooling fans. Cooling of the beam pipe is another possibility.
 +
*** Need to check about 5-7 channels (includes 2 with loose connections, which will be fixed today, 01/14) that have unexpected signal shapes than expected, probably because of loose divider socket connections. Fixing them is difficult because of there are many other cables in the way and fixing one may loosen others.
 +
*** Got the new trigger firmware and started tested it. Looks good so far but there are still tests to be performed.
 
**FCal (Malte/Mark Dalton)  
 
**FCal (Malte/Mark Dalton)  
***Lot of work done since last week. Running it now with LED and cosmics.
+
***Running it now with LED and cosmics. Cosmics data taking started mid-December.
 +
***Analyzing the cosmic data to determine the optimal HV settings. It is a lengthy process but a procedure has been devised.
 +
***Found that between 30 and 50 channels were malfunctioning. Many can probably be fixed by a base change. Most of them are now fixed, but small issue are remaining and being fixed.
 
**ToF (Simon/Beni).
 
**ToF (Simon/Beni).
 
***Installed: requires re-shimming to match the new ECAL/FCAL
 
***Installed: requires re-shimming to match the new ECAL/FCAL
***Once it is surveyed and cabled (before Christmas in principle), it can be powered and checked out.
+
***The channel that did not count is now fixed. All channels are now good.
***Need to take (non-beam) data to re-calibrate TDC chips. Need to wait for ToF to be cabled. Calibration data taking takes a long time (~week).
+
***Beni is in the process of calibrating the TDC chips (calibration data taking takes a long time, ~week).
 
**DIRC (Justin).
 
**DIRC (Justin).
***Water tank now installed.
+
***LED system is now fixed. Test with LED started. Will do a new round of LED test once the dark cover is put back.  
 
**Support from Electronic Group (Eugene)
 
**Support from Electronic Group (Eugene)
***Do we have a phone number for on-call contact?
+
***We will have a phone number for on-call contact. (Mark Dalton ordered a phone. Still waiting for it to be delivered.)
 
*RSAD and ESAD Safety documents (Beni):  
 
*RSAD and ESAD Safety documents (Beni):  
***ESAD is updated and uploaded to github.
+
**Ed Folt found a few items that needed to be updated in the new RSAD and ESAD for 2025. Beni has now done the update (01/15/2025). The new document will be sent again to Ed for review.
***RSAD is prepared by RadCon and out for the required signatures.
+
**ESAD and RSAD are ready and available at the [https://www.jlab.org/Hall-D/hd_safety.php Hall D safety page].  
*QUESTION: What equipment should be left on during the Christmas break?
+
**Need run certificate from Patricia.
 
*Phones  
 
*Phones  
*Pictures of the Counting Room white board do not update. Sergei and Alexa A. will look into this. (Hovanes knows how to fix this).
+
*<strike>Pictures of the Counting Room white board do not update. Sergei and Alexa A. will look into this. (Hovanes knows how to fix this).</strike>
 +
** tested and working
 
<!--**<font color="red">System experts should start looking for their phone and charger.</font>  
 
<!--**<font color="red">System experts should start looking for their phone and charger.</font>  
 
**<font color="red">System experts should have found their on-call phones by now and should start charging them.</font>  
 
**<font color="red">System experts should have found their on-call phones by now and should start charging them.</font>  

Latest revision as of 11:03, 17 January 2025

Spring 2025 Run

Google Spreadsheet. 


GlueX experiment (January 24 - July 20 2025)


Connect Information

To connect, please see the information on the GlueX meeting wikipage


Meeting General Agenda

Run planning meetings:


Beam and Hall configuration

  • Commissioning of ECal.
    • Other task that can be done if there are pauses in the ECal commissioning
      • Diamond alignment (Hovanes)
      • ...
  • Commissioning of FCal.
  • Experiment: GlueX-II/JEF.
  • Beam energy expected:
    • 12 GeV
  • Beam polarization expected:
    • from 5% to 73%, depending on other passes of the other Halls . No expectation of decent polarization before March 19th. Then 73% for the rest run.
  • Solenoid:
    • 1350A
  • CW Beam:
    • 250 MHz frequency.
    • Range: 1na-1000 nA.
    • Chopper slit: TBD
    • Standard current and radiators
      • 300 nA on a 4.1·10-4 R.L. radiator (50 μm diamond). (RSAD limit 400nA on 58 μm diamond))
      • 300 on a 33.7·10-5 R.L. AL radiator (30 µm Al). (RSAD limit 480nA on 30 µm Al radiator))
  • Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer radiators: Start with JD70-107. Next, JD70-109. JD70-103 may still be usable if needed. TBD: Install two thick 80μm new diamonds, to be available for opportunistic tests.
      • Diamond JD70-107 (55 μm - 4.6·10-4 R.L., 7×7 mm²) New crystal. (Not expected to be great according to rocking curve.)
      • Diamond JD70-109 (50 μm - 4.1·10-4 R.L., 7×7 mm² - New crystal - (Not expected to be good according to rocking curve.)
      • Diamond JD70-103 (50 μm - 4.1·10-4 R.L., 7×7 mm²) Used in CPP. Partly spent.
      • (Diamond JD70-106 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.)
      • (Diamond JD80-212 (80 μm - 6.6·10-4 R.L., 8×8 mm²) - To be tested.)
      • (Diamond JD80-213 (80 μm - 6.6·10-4 R.L., 8×8 mm²) - To be tested.)
      • (Diamond JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - Spent: used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020/Fall 2021) To be removed in January
      • Amorphous 40 μm Al radiator (44.9·10-5 R.L.)
      • Amorphous 1.86·10-5 R.L., (for TAC run).
    • Amorphous
      • 1.64 µm Al (1.86·10-5 R.L., see study)
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Default running: 5.0 mm.
  • TPol converter: 75 μm
  • Miscellaneous:
    • PS test area. Tests must be fully opportunistic,without interfering with ECal commissioning and GlueX data taking. No more than 3 persons involved in such tests should be in the Hall during a control access:

General Information

This document describes the run plan for the Hall D Spring 2025 run.

  1. February or March TBD: Electron beam restoration.
  2. January 24th - July 20th: 26 weeks for upgraded ECal commissioning and GlueX-II/JEF. As of 01/14/25, a 5 to 7 weeks shift is expected ⇒ March. 1st - Aug. 24th:
  • Accelerator overall plan and priorities: Deliver physics beam to 4 halls
  • Hall D plan summary:
    • Beam and detector check-out: 50 - 300 nA. ~ a day.
      • Commission new beam profiler from Regina (Hovanes).
    • Commission of ECal (~ a month. 150 nA)
      • Opportunistic tests during possible pauses of ECAL Commissioning:
        • Diamond alignment (Hovanes, see below)
        • CDC HV scans (Beni, Naomi). Need compatible trigger
        • ToF HV scans (Beni). Need compatible trigger
        • Lead glass HV scans (Malte). Need compatible trigger
        • Study thick 80μm new diamond (Richard).
        • Others?
    • Commissioning of FCal (In parallel with ECal. Needs a commissioning plan.)
    • Diamond alignment: Stable beam (no frequent trip) 20 nA without FSD for 2-3 shifts.
    • Experiment: GlueX-II/JEF E12-12-002
    • 2 TAC runs. ~nA or less. The bleedthrough should be small compare to it. 1 run just after ECAL Commissioning. Another near the end of the run.
      • Ideally, TAC run should be done with the other Halls off.
      • If not possible, the next best option is to have both A and C not at 5 passes, so that magnetic extraction is performed (less bleedthrough than with RF separation).
        • Either Hall A or C or both are at 5 passes during the whole run ⇒ we will have to watch for opportunity when the Hall at 5 passes is down.
    • High luminosity runs: up to 1 week at 650nA, and up to 1 day at 1 uA.
    • 2 empty target runs (300 nA). 1 run at the start of GlueX-II data taking. Another near the end of the run.
    • Straight track run: 2 shifts (50% efficiency: one shift of good data) (50 nA on 10-4 R.L. radiator).
    • Opportunistic tests:
      • GEM-TRD test during ECAL Commissioning Positioned 3 to 6 o'clock in front of forward detectors, looking downstream.
  • Expected Staffing and responsibilities:
    • The Run Coordinator oversees the run:
      • Jan. ?? - ??, ?? days (beam restoration): Alexandre Deur
      • Jan. 24 - 29, 6 days: Alexandre Deur
      • Jan. 29 - Feb. 5, 1 week: Igal Jaegle
      • Feb. 5-12, 1 week: Simon Taylor
      • Feb. 12-19, 1 week: Edmundo Barriga
      • Feb. 19-26, 1 week: Colin Gleason
      • Feb. 26-March 5, 1 week: Igal Jaegle
      • March 5-12, 1 week: Simon Taylor
      • March 12-19, 1 week: Mike McCaughan
      • March 19-26, 1 week: Drew Smith
      • March 26-Apr. 2, 1 week: Naomi Jarvis
      • Apr. 2-9, 1 week: Boris Grube
      • Apr. 9-16, 1 week: Mark Dalton
      • Apr. 16-23, 1 week: Hao Li
      • Apr. 23-30, 1 week: Mike McCaughan
      • Apr. 30-May 7, 1 week: Alexandre Deur
      • May 7-14, 1 week: Richard Jones
      • May 14-21, 1 week: Justin Stevens
      • May 21-28, 1 week: Boris Grube
      • May 28-June 4, 1 week: Amy Schertz
      • June 4-11, 1 week: Edmundo Barriga
      • June 11-18, 1 week: Naomi Jarvis
      • June 18-25, 1 week: Drew Smith
      • June 25-July 2, 1 week: Hao Li
      • July 2-9, 1 week: Susan Schandmand
      • July 9-16, 1 week: Susan Schandmand
      • July 16-23, 1 week: Mark Dalton
      • July 23-30, 1 week: Alexandre Deur
    • The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (S. Spiegel) verify that the proper safety rules are followed. PDL is:
      • PDL: B.Zihlmann
    • The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.
    • Shifts: 2 person shifts: 1 leader and 1 worker, both on-site, scheduled through the GlueX shift scheduler.
  • Coordination Activities:
    • The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
    • Run meetings: broadcasted on Zoom. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.

Runplan

Hall D situation room (current run plan)

Hall D counting room white board


Accelerator status

Hot Checkout

To be completed by TBD

0% ready ; 0% checked ; 100% not ready

Readiness for Spring 2025 run

  • Solenoid (Tim/Eugene/Beni/Scott):
    • Solenoid is cold, full with LHe and tested to 825A. Waiting to be closer to the start of the run (when the Hall is in Controlled Access) to test it to full current. Check-out done as far as it can be.
  • Surveys (Tim/Scott)
    • Surveys yet to be finalized or TBD:
      • ToF done
      • Need to redo the goniometer survey after we install two 80 μm diamonds. (Next week)
      • PS may need to be redone.
      • DIRC. Done on 01/14 Dark cover being installed today (01/15)
      • Beam pipe
      • GEM Done on 01/09
      • Luminosity monitor
      • Target and Start Counter. Done
  • DAQ (Sergei).
    • Every component of the DAQ are tested and working individually.
    • Beam helicity module has been inserted.
    • Need to test RCDB.
    • New version of CODA available: Will need to be tested (Sacha).
  • Trigger (Alex Somov).
    • Initial implementation of the VTP firmware. All 6 VTPs now installed in VXS crates of ECal and configured. Started testing the trigger. All individual crates are generating triggers. Now, need to test how the operate together. May be able to start testing next week with cosmics. It will then need to be integrated in DAQ (old and new version of CODA).
  • Beam line
    • Diamond status (Tim/Hovanes).
      • Two thick 80μm new diamonds (JD80-212, JD80-213) have been now glued and sent to JLab. The were received and will be install this week (Jan 13-17).
      • Need to remove spent diamond JD70-105 for anneal tests at U.Conn. Next week (Jan 20-24).
      • Richard is glueing new 80μm diamonds (which ones?) to their holders. They will be sent soon to JLab.
      • Putting new diamond and/or removing mounted diamond ⇒ re-surveying the goniometer. (Presumably, after mid-January.)
    • Tagger magnet
      • Ready and NMR is working.
    • Tagger hodoscope (A. Somov).
      • TBD
    • Tagger microscope (R. Jones/Igal).
      • TBD
    • Goniometer (Hovanes).
      • Removed from beamline and reinstalled ⇒ all diamond alignments will need to be redone.
    • Collimator Motion (Hovanes).
      • tested and working
    • Active collimator detectors(Richard)
    • Profiler (Hovanes)
      • New profiler (Regina): All tests are fine and surveyed, but will need to be checked with beam.
    • Luminosity monitor (=Active Target) (Hovanes).
    • Halo monitors (Hovanes)
    • Pair Spectrometer (Alex Somov)
      • Tested with Cosmics. There is a couple of dead channels. Fernando and Chris will look into fixing one of them (we can live without the other channel).
    • Polarimeter (Beni/M. Dugger).
      • Detector is operational, Voltages were applied and signals observed. M. Dugger had planned to come on Jan 24-26 to do a complete checkout but this may be a problem because LO/TO is needed and cannot be easilly done on week-end. Tim, Scot, Beni and M. Dugger are looking into a solution. (The ePAS is ready.)
    • LH2 Target (Tim/A. Deur)
      • Surveyed and ready.
    • TAC (Alex Somov).
      • Assembled, tested and surveyed. Will be cabled on Jan. 16 or 17.
    • Slow control (Hovanes).
      • Lots of work to be done. Need ECal hardware (temperature sensor, High Voltage equipment) to be finalized before to start Slow Control work on it. Need also to do some test with DIRC. Justin: it is ready for these tests.
    • RF (Sergei)
      • Need to wait for the cables to be reconnected, which can be done only after the DIRC is placed in position and surveyed (this should be done by now).
    • Radiation monitors (A. Deur)
    • x-ray W shield (Tim).
  • Detector systems
    • Start Counter (Simon/Joerg/Beni)
      • Operational, everything look good.
    • FDC (Lubomir).
      • Chiller is now operational. The issue with its interlock (rather, the communication box) is gone.
      • Of the two flash-ADC that were not communicating, one is now fixed and for the other it will be replaced by one borrowed from the TRD.
      • Looking at cosmic data.
    • CDC (Naomi/Lubomir/Beni).
      • Earlier assessment of readiness were done too long ago (December). It will be good to recheck readiness. Will take more cosmics data.
      • One channel has a bit missing. May need to borrow a fADC module from the TRD.
    • Gas system (Beni/Lubomir)
      • Looking good.
    • BCal (Mark Dalton/Malte)
      • Detector appears functional. Ready to start the HCO. Need 3 periods of 4h when DAQ is available. Mark is coordinating this with Sasha.
    • ECal (Sasha)
      • Ecal was powered-up during Xmas break and a large sample of cosmic data were taken. They look good and all channels are working. Next step is to equalize gains and start calibration. Once realistic HV are implemented, Sasha will start taking cosmics data.
      • ECal temperature:
        • Installed 3 temperature sensors. ECal temperatures are now in the monitoring and interlock systems.
        • There is a significant temperature rise when the High Voltage are turned on. The ECal crystals are very temperature-sensitive, so this may impact the ECal calibration.
        • To minimize the temperature issue, Sacha will try to increase/add air flow from cooling fans. Cooling of the beam pipe is another possibility.
      • Need to check about 5-7 channels (includes 2 with loose connections, which will be fixed today, 01/14) that have unexpected signal shapes than expected, probably because of loose divider socket connections. Fixing them is difficult because of there are many other cables in the way and fixing one may loosen others.
      • Got the new trigger firmware and started tested it. Looks good so far but there are still tests to be performed.
    • FCal (Malte/Mark Dalton)
      • Running it now with LED and cosmics. Cosmics data taking started mid-December.
      • Analyzing the cosmic data to determine the optimal HV settings. It is a lengthy process but a procedure has been devised.
      • Found that between 30 and 50 channels were malfunctioning. Many can probably be fixed by a base change. Most of them are now fixed, but small issue are remaining and being fixed.
    • ToF (Simon/Beni).
      • Installed: requires re-shimming to match the new ECAL/FCAL
      • The channel that did not count is now fixed. All channels are now good.
      • Beni is in the process of calibrating the TDC chips (calibration data taking takes a long time, ~week).
    • DIRC (Justin).
      • LED system is now fixed. Test with LED started. Will do a new round of LED test once the dark cover is put back.
    • Support from Electronic Group (Eugene)
      • We will have a phone number for on-call contact. (Mark Dalton ordered a phone. Still waiting for it to be delivered.)
  • RSAD and ESAD Safety documents (Beni):
    • Ed Folt found a few items that needed to be updated in the new RSAD and ESAD for 2025. Beni has now done the update (01/15/2025). The new document will be sent again to Ed for review.
    • ESAD and RSAD are ready and available at the Hall D safety page.
    • Need run certificate from Patricia.
  • Phones
  • Pictures of the Counting Room white board do not update. Sergei and Alexa A. will look into this. (Hovanes knows how to fix this).
    • tested and working
  • Hall Status/safety (Tim/Scott)
  • Other topics?

Live Camera Feeds from the Four Counting Houses

  1. These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.
  2. Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.
  • Beni will contact Walt Akers to inquire about their status. Done. Walt will take care of it.

Running Shifts Remote