Difference between revisions of "2013-10-30"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday October 30, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == ...") |
(→Reports from Technical Groups) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 36: | Line 36: | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
* Calorimeters: | * Calorimeters: | ||
− | ** Calorimetry [[Oct | + | ** Calorimetry [[Oct 22, 2013 Calorimetry| October 22, 2013]] |
− | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-10- | + | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-10-29 | October 29, 2013]] |
− | * Tracking [[October | + | * Tracking [[October 23, 2013 tracking CDC/FDC| October 23, 2013]] |
** CDC --- transport to Jefferson Lab on October 29. | ** CDC --- transport to Jefferson Lab on October 29. | ||
** FDC | ** FDC | ||
* PID | * PID | ||
** TOF [[GlueX TOF Meeting, October 10, 2013|October 10, 2013]] | ** TOF [[GlueX TOF Meeting, October 10, 2013|October 10, 2013]] | ||
− | ** Start Counter [[GlueX Start Counter Meeting, | + | ** Start Counter [[GlueX Start Counter Meeting, October 17, 2013#Minutes|October 17, 2013]] |
− | ** PID Upgrades [[ | + | ** PID Upgrades [[October 18, 2013 PID Upgrade|October 18, 2013]] |
+ | * Calibration | ||
* Engineering | * Engineering | ||
** Magnet | ** Magnet | ||
Line 52: | Line 53: | ||
* Electronics | * Electronics | ||
* Trigger | * Trigger | ||
− | ** Hardware (Level-1) [[OWG Meeting | + | ** Hardware (Level-1) [[OWG Meeting 23-Oct-2013 |October 23, 2013]] |
** Software (Level-3) [[October 15, 2013| October 15, 2013]] | ** Software (Level-3) [[October 15, 2013| October 15, 2013]] | ||
− | * DAQ/Monitoring/Controls [[OWG Meeting | + | * DAQ/Monitoring/Controls [[OWG Meeting 23-Oct-2013 |October 23, 2013]] |
− | * Offline [[GlueX Offline Meeting, | + | * Offline [[GlueX Offline Meeting, October 16, 2013|October 16, 2013]] |
** Software Review Planning | ** Software Review Planning | ||
− | * Photon Beam and Tagger [[BLTWG Meeting 10/ | + | * Photon Beam and Tagger [[BLTWG Meeting 10/28/2013|October 28, 2013]] |
− | * Physics [[ | + | * Physics [[October 21, 2013, Physics Working Group|October 21, 2013]] |
Latest revision as of 14:01, 29 October 2013
Contents
Meeting Time and Place
The meeting will be on Wednesday October 30, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Contracts
- UConn (Diamond)
Reports from Technical Groups
- Calorimeters:
- Calorimetry October 22, 2013
- BCAL Reconstruction October 29, 2013
- Tracking October 23, 2013
- CDC --- transport to Jefferson Lab on October 29.
- FDC
- PID
- TOF October 10, 2013
- Start Counter October 17, 2013
- PID Upgrades October 18, 2013
- Calibration
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation October 11, 2013 Installation
- Electronics
- Trigger
- Hardware (Level-1) October 23, 2013
- Software (Level-3) October 15, 2013
- DAQ/Monitoring/Controls October 23, 2013
- Offline October 16, 2013
- Software Review Planning
- Photon Beam and Tagger October 28, 2013
- Physics October 21, 2013