Difference between revisions of "2014-01-22"
From GlueXWiki
(→Announcements) |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 26: | Line 26: | ||
=== Announcements === | === Announcements === | ||
* [[GlueX-Collaboration-Feb-2014|Collaboration Meeting]] February 20-22, 2014 | * [[GlueX-Collaboration-Feb-2014|Collaboration Meeting]] February 20-22, 2014 | ||
− | * [ | + | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2376 Summary of Hall-D Subsystems] |
=== MOU and Contract Status === | === MOU and Contract Status === | ||
Line 34: | Line 34: | ||
* Calorimeters: | * Calorimeters: | ||
** Calorimetry [[Jan 16, 2014 Calorimetry| January 16, 2014]] | ** Calorimetry [[Jan 16, 2014 Calorimetry| January 16, 2014]] | ||
+ | ** FCAL 1st Cosmic [https://halldweb.jlab.org/wiki/index.php/File:FCAL_1st_cosmic.jpg] | ||
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-12-10 | December 10, 2013]] | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-12-10 | December 10, 2013]] | ||
* Tracking FADC FPGA [[FADC_FPGA_Programming_Jan_14,_2014 |January 14, 2014]] | * Tracking FADC FPGA [[FADC_FPGA_Programming_Jan_14,_2014 |January 14, 2014]] | ||
Line 53: | Line 54: | ||
* DAQ/Monitoring/Controls [[OWG Meeting 15-Jan-2014 |January 15, 2014]] | * DAQ/Monitoring/Controls [[OWG Meeting 15-Jan-2014 |January 15, 2014]] | ||
* Offline Software | * Offline Software | ||
− | ** Offline [[GlueX Offline Meeting, January 22, 2014|January 22, 2014]] | + | ** Offline [[GlueX Offline Meeting, January 22, 2014|January 22, 2014]], Data Challenge [[GlueX Data Challenge Meeting, January 31, 2014|January 31, 2014]] |
− | ** Calibration [[January 15, 2014 Calibration| January 15, 2014 | + | ** Calibration [[January 15, 2014 Calibration| January 15, 2014]] |
* Photon Beam and Tagger [[BLTWG Meeting 01/21/2014|January 21, 2014]] | * Photon Beam and Tagger [[BLTWG Meeting 01/21/2014|January 21, 2014]] | ||
* Physics [[January 13, 2014, Physics Working Group|January 13, 2014]] | * Physics [[January 13, 2014, Physics Working Group|January 13, 2014]] |
Latest revision as of 16:48, 24 February 2017
Contents
Meeting Time and Place
The meeting will be on Wednesday January 22, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Collaboration Meeting February 20-22, 2014
- Summary of Hall-D Subsystems
MOU and Contract Status
- Contracts
Reports from Technical Groups
- Calorimeters:
- Calorimetry January 16, 2014
- FCAL 1st Cosmic [1]
- BCAL Reconstruction December 10, 2013
- Tracking FADC FPGA January 14, 2014
- CDC
- FDC
- PID
- TOF January 16, 2014
- Start Counter January 23, 2014
- PID Upgrades November 15, 2013
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation January 3, 2014 Installation
- Electronics
- Trigger
- Hardware (Level-1) January 15, 2014
- Software (Level-3) January 21, 2014
- DAQ/Monitoring/Controls January 15, 2014
- Offline Software
- Offline January 22, 2014, Data Challenge January 31, 2014
- Calibration January 15, 2014
- Photon Beam and Tagger January 21, 2014
- Physics January 13, 2014