Difference between revisions of "JEF meeting, June 24, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 6: | Line 6: | ||
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5655 DNP2022 abstract] | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5655 DNP2022 abstract] | ||
* Simulations/Analysis | * Simulations/Analysis | ||
+ | ** [https://halldweb.jlab.org/wiki/images/d/d0/Glue-jefxd-igal-jaegle-24062022.pdf Update on eta to ggpi^0] -- ig | ||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
**Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550). | **Moving crystals from JLab's pool to the Lab [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_10_22/moving_crystals1.jpg] Moved 335 CRYTUR crystals (need 550). |
Revision as of 09:08, 24 June 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- DNP2022 abstract
- Simulations/Analysis
- Update on eta to ggpi^0 -- ig
- Preparation of parts for FCAL2 modules -- Sasha
- Moving crystals from JLab's pool to the Lab [1][2] Moved 335 CRYTUR crystals (need 550).
- Preparation of parts[3][4][5]
- Preshaping ESR foils
- Wrapping crystals
- Module fabrication
- Wrapped CRYTUR crystals: 491 (60 + 185 + 166 + 80)
- Remaining 126, 1.5 weeks of work
- Students reports
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 598
- All 561 SICCAS
- 37 CRYTUR, Remaining: 590
- Clean room EEL126
- Students reports
- Light Monitoring System -- Arshak