=Agenda= | =Agenda= | ||
− | * Simulations/Analysis | + | * '''Simulations/Analysis''' |
** Photon reconstruction (Azizah) | ** Photon reconstruction (Azizah) | ||
Line 14: | Line 14: | ||
*** DSG group continues wrapping (Mindy) | *** DSG group continues wrapping (Mindy) | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
− | * Module fabrication -- Sasha | + | * '''Module fabrication''' -- Sasha |
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
** Fabricated modules: <span style="color:#FF0000"> Total 1318 </span> (5 modules fabricated since last week) | ** Fabricated modules: <span style="color:#FF0000"> Total 1318 </span> (5 modules fabricated since last week) | ||
Line 20: | Line 20: | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 742 CRYTUR], available: 40 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 742 CRYTUR], available: 40 | ||
− | * Preparation for the FCAL2 installation (coordination with Tim's group) -- Sasha | + | * '''Preparation for the FCAL2 installation (coordination with Tim's group)''' -- Sasha |
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/November_02,_2022_FCAL_Insert_Installation_Meeting November 2022] | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/November_02,_2022_FCAL_Insert_Installation_Meeting November 2022] | ||
*** Detector cabling and patch panels for the FCAL insert | *** Detector cabling and patch panels for the FCAL insert |
Revision as of 19:02, 3 November 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Photon reconstruction (Azizah)
- Preparation of parts for FCAL2 modules -- Sasha
- Received 25 CRYTUR crystals during this week [1]
- Wrapped CRYTUR crystals: 742
- Available for wrapping: 782 - 742 = 40 (5 crystals were wrapped during last week)
- DSG group continues wrapping (Mindy)
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1318 (5 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 742 CRYTUR, available: 40
- Preparation for the FCAL2 installation (coordination with Tim's group) -- Sasha
- Updates from the meetings with Tim's group November 2022
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Meeting with the detector support group
- Updates from the meetings with Tim's group November 2022
- Light Monitoring System -- Arshak