Difference between revisions of "JEF meeting, November 11, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 7: | Line 7: | ||
* '''Simulations/Analysis''' | * '''Simulations/Analysis''' | ||
*'''Preparation of parts for FCAL2 modules''' -- Sasha | *'''Preparation of parts for FCAL2 modules''' -- Sasha | ||
+ | ** Received 25 CRYTUR crystals during this week [https://halldweb.jlab.org/wiki/index.php/CRYTUR] | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 742 ] | ||
+ | *** Available for wrapping: 782 - 742 = 40 (5 crystals were wrapped during last week) | ||
+ | *** Mindy (DSG group) continues wrapping crystals | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 1318 </span> (5 modules fabricated since last week) | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 742 CRYTUR], available: 40 | ||
* '''Preparation for the FCAL2 installation (coordination with Tim's group)''' -- Sasha | * '''Preparation for the FCAL2 installation (coordination with Tim's group)''' -- Sasha | ||
+ | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/November_02,_2022_FCAL_Insert_Installation_Meeting November 2022] | ||
+ | *** Detector cabling and patch panels for the FCAL insert | ||
+ | *** Manpower and division of tasks | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Meeting with the detector support group] | ||
* '''Light Monitoring System''' -- Arshak | * '''Light Monitoring System''' -- Arshak |
Revision as of 10:18, 11 November 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Received 25 CRYTUR crystals during this week [1]
- Wrapped CRYTUR crystals: 742
- Available for wrapping: 782 - 742 = 40 (5 crystals were wrapped during last week)
- Mindy (DSG group) continues wrapping crystals
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1318 (5 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 742 CRYTUR, available: 40
- Preparation for the FCAL2 installation (coordination with Tim's group) -- Sasha
- Updates from the meetings with Tim's group November 2022
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Meeting with the detector support group
- Updates from the meetings with Tim's group November 2022
- Light Monitoring System -- Arshak