Line 37: | Line 37: | ||
** Still no power on the ECAL platform (expect delay with the development of the trigger/DAQ) | ** Still no power on the ECAL platform (expect delay with the development of the trigger/DAQ) | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
− | * ''' | + | * '''Simulations''' -- Simon / Stjepan |
** pi0gg channel simulations and analysis done with genEtaRegge and analyzed with FSRoot for the JEF FCAL2 geometry [https://halldweb.jlab.org/DocDB/0063/006339/001/JEF%20Simulations%20v2%20Complete.pdf] | ** pi0gg channel simulations and analysis done with genEtaRegge and analyzed with FSRoot for the JEF FCAL2 geometry [https://halldweb.jlab.org/DocDB/0063/006339/001/JEF%20Simulations%20v2%20Complete.pdf] |
Revision as of 11:53, 2 February 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV cables: received 1280 in total
- - HV distribution boards: in preparation
- - LV cables: 150 cables received
- - LV distribution boards. Received 4 boards, performed initial cehck, need to solder connectors [2]
- - Optical fibers and parts for the trigger/DAQ have been ordered
- Ongoing projects -- Sasha, all
- - Testing and labeling cables, 100 short LV cables tested and labeled during this week.
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections)
- - Preparation of the LMS
- - Need to glue Al flange to the optical fiber
- - Ready for installation [5]
- - Radiation tests of the PMT active base [6]
- Finished tests, working on the tech note
- - Inventory database and GUI for installed electronics
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Detector installation [9][10][11]
- Installation of the LMS
- Cable and divider installation [14]
- Still no power on the ECAL platform (expect delay with the development of the trigger/DAQ)
- Detector installation page
- Simulations -- Simon / Stjepan
- pi0gg channel simulations and analysis done with genEtaRegge and analyzed with FSRoot for the JEF FCAL2 geometry [18]