Difference between revisions of "2016-04-27"
From GlueXWiki
(→Analysis Activities) |
(→Announcements) |
||
Line 16: | Line 16: | ||
== Agenda == | == Agenda == | ||
=== Announcements === | === Announcements === | ||
− | |||
* [https://www.jlab.org/conferences/photoproduction16/ Nuclear Photoproduction with GlueX] April 28-29 | * [https://www.jlab.org/conferences/photoproduction16/ Nuclear Photoproduction with GlueX] April 28-29 | ||
* [[GlueX-Collaboration-May-2016|Collaboration Meeting]] May 9-11 | * [[GlueX-Collaboration-May-2016|Collaboration Meeting]] May 9-11 | ||
* [[GlueX_Physics_Workshop_2016|The May Physics / Analysis Workshop]] after May Collaboration Meeting, May 11-13 | * [[GlueX_Physics_Workshop_2016|The May Physics / Analysis Workshop]] after May Collaboration Meeting, May 11-13 | ||
+ | * Solenoid Update | ||
=== The Spring 2016 Run === | === The Spring 2016 Run === |
Revision as of 10:40, 27 April 2016
Contents
Meeting Time and Place
The meeting will be on Wednesday April 27, 2016 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Nuclear Photoproduction with GlueX April 28-29
- Collaboration Meeting May 9-11
- The May Physics / Analysis Workshop after May Collaboration Meeting, May 11-13
- Solenoid Update
The Spring 2016 Run
- Graphical Summary of Triggers
- Details on collected triggers DocDB
- Run Coordination Meetings: Spring 2016 Run
- Progress report for the last two weeks: File:RC report gluex weekly march16 2016.pdf
- Production Statistics Spreadsheet
- Time charts for the last 4 weeks, readjusted for the CHL repair
- Shift Schedule
Analysis Activities
- Updates on results from the Spring 2016 Run.
- Offline Activities April 13, 2016
- Software Status
- Offline Monitoring
- Calibration April 20, 2016 - Calibration Dashboard
- Calibration Passes on Data
- Physics and Analysis April 18, 2016
- Physics Working Group
- Analysis Activities Reaction page with plugins
Data Acquisition and Electronics Systems
- Online Systems March 23, 2016
- DAQ
- Controls Status
- Monitoring
- Level-3 Trigger
- Electronics and Trigger
- Electronics Update
- FADC FPGA March 31, 2016
- Level-1 Trigger
Detector Updates
- Engineering Activities
- Target
- Magnets
- Other Activities
- Beamline Status April 25, 2016
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter March 24, 2016
- Tracking April 21, 2016
- CDC
- FDC
- Calorimeters: April 21, 2016
- BCAL
- FCAL
- TOF March 8, 2016
- DIRC System April 22, 2016 PID Upgrade
Other Activities
- AOT