Difference between revisions of "JEF meeting, November 4, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 24: | Line 24: | ||
*** Detector cabling and patch panels for the FCAL insert | *** Detector cabling and patch panels for the FCAL insert | ||
*** Manpower and division of tasks | *** Manpower and division of tasks | ||
− | *** Projects for summer students | + | *** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] |
** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Meeting with the detector support group] | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Meeting with the detector support group] | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 18:55, 3 November 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Photon reconstruction (Azizah)
- Preparation of parts for FCAL2 modules -- Sasha
- Received 25 CRYTUR crystals during this week [1]
- Wrapped CRYTUR crystals: 742
- Available for wrapping: 782 - 742 = 40 (5 crystals were wrapped during last week)
- DSG group continues wrapping (Mindy)
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1318 (5 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 742 CRYTUR, available: 40
- Preparation for the FCAL2 installation (coordination with Tim's group) -- Sasha
- Updates from the meetings with Tim's group November 2022
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Meeting with the detector support group
- Updates from the meetings with Tim's group November 2022
- Light Monitoring System -- Arshak