Difference between revisions of "JEF meeting, November 4, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 8: | Line 8: | ||
** Photon reconstruction (Azizah) | ** Photon reconstruction (Azizah) | ||
− | *Preparation of parts for FCAL2 modules -- Sasha | + | *'''Preparation of parts for FCAL2 modules''' -- Sasha |
** Received 25 CRYTUR crystals during this week [https://halldweb.jlab.org/wiki/index.php/CRYTUR] | ** Received 25 CRYTUR crystals during this week [https://halldweb.jlab.org/wiki/index.php/CRYTUR] | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 742 ] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 742 ] |
Revision as of 19:02, 3 November 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Photon reconstruction (Azizah)
- Preparation of parts for FCAL2 modules -- Sasha
- Received 25 CRYTUR crystals during this week [1]
- Wrapped CRYTUR crystals: 742
- Available for wrapping: 782 - 742 = 40 (5 crystals were wrapped during last week)
- DSG group continues wrapping (Mindy)
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1318 (5 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 742 CRYTUR, available: 40
- Preparation for the FCAL2 installation (coordination with Tim's group) -- Sasha
- Updates from the meetings with Tim's group November 2022
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Meeting with the detector support group
- Updates from the meetings with Tim's group November 2022
- Light Monitoring System -- Arshak