For a more concise presentation see the NIMA article <ref name="GlueXSCpaper"/>. | For a more concise presentation see the NIMA article <ref name="GlueXSCpaper"/>. | ||
How the SC fits into the full GlueX detector is described in a separate paper <ref> S. Adhikari ''et al.'' [GlueX], The GLUEX beamline and detector, Nucl. Instrum. Meth. A '''987''', 164807 (2021) [https://doi.org/10.1016/j.nima.2020.164807 doi:10.1016/j.nima.2020.164807] [[https://arxiv.org/abs/2005.14272 arXiv:2005.14272] [physics.ins-det]].</ref>. | How the SC fits into the full GlueX detector is described in a separate paper <ref> S. Adhikari ''et al.'' [GlueX], The GLUEX beamline and detector, Nucl. Instrum. Meth. A '''987''', 164807 (2021) [https://doi.org/10.1016/j.nima.2020.164807 doi:10.1016/j.nima.2020.164807] [[https://arxiv.org/abs/2005.14272 arXiv:2005.14272] [physics.ins-det]].</ref>. | ||
+ | |||
+ | == Procedures == | ||
+ | * [https://halldweb.jlab.org/hdops/wiki/index.php/Start_Counter_Shift Start Counter Shift procedures] (in hdops wiki) | ||
+ | * [[Start Counter Calibration Procedures]] | ||
== Resources (some historical or obsolete) == | == Resources (some historical or obsolete) == | ||
* For a recent description see the Start Counter Update [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=992 GlueX-doc-992] | * For a recent description see the Start Counter Update [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=992 GlueX-doc-992] | ||
Line 20: | Line 24: | ||
* [[Start Counter Operation Methods]] | * [[Start Counter Operation Methods]] | ||
* [[DAQ Tasks for Spring 2015 Commissioning Run]] | * [[DAQ Tasks for Spring 2015 Commissioning Run]] | ||
− | + | ||
* [[Start Counter Electronics Channel Maps and Cabling]] | * [[Start Counter Electronics Channel Maps and Cabling]] | ||
Revision as of 20:31, 8 November 2022

Fig. 1: The GlueX Start Counter mounted to the liquid H2 target assembly[1].

Fig. 2: Start Counter readout electronics diagram [1].
Introduction
The Start Counter (SC) surrounds the liquid hydrogen target. The primary purpose of the SC is to identify the photon beam buckets associated with the individual events. For an in-depth discussion of the Start Counter design, construction, and calibration see Eric Pooser's dissertation[2]. For a more concise presentation see the NIMA article [1]. How the SC fits into the full GlueX detector is described in a separate paper [3].
Procedures
- Start Counter Shift procedures (in hdops wiki)
- Start Counter Calibration Procedures
Resources (some historical or obsolete)
- For a recent description see the Start Counter Update GlueX-doc-992
- Drawings
- Start Counter schedule from Nov. 2012 baseline
- Fastrack schedule (draft)
- Start Counter Meetings
- Start Counter Cheat Sheet
- Start Counter Silicon Photomultiplier Read-Out
- Start Counter Simulations
- Start Counter Background Studies
- Start Counter Material Study
- Start Counter Operation Methods
- DAQ Tasks for Spring 2015 Commissioning Run
References
- ↑ 1.0 1.1 1.2 E. Pooser et al., The GlueX Start Counter Detector, Nucl. Instrum. Meth. A 927, 330-342 (2019) doi:10.1016/j.nima.2019.02.029 [arXiv:1901.02759 [physics.ins-det]].
- ↑ Pooser, Eric J., "The GlueX Start Counter & Beam Asymmetry
in Single
Photoproduction" (2016). FIU Electronic Theses and Dissertations. 2450. https://digitalcommons.fiu.edu/etd/2450
- ↑ S. Adhikari et al. [GlueX], The GLUEX beamline and detector, Nucl. Instrum. Meth. A 987, 164807 (2021) doi:10.1016/j.nima.2020.164807 [arXiv:2005.14272 [physics.ins-det]].