Difference between revisions of "JEF meeting, May 5, 2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 13: | Line 13: | ||
** More than 200 long signal cables received, can start checking, bundling, labeling | ** More than 200 long signal cables received, can start checking, bundling, labeling | ||
** Procurement parts for the LMS | ** Procurement parts for the LMS | ||
− | **: Ordered 16,000 ft of optical fibers. Expect that | + | **: Ordered 16,000 + 8,000 = 24,000 ft of optical fibers. Expect that the first batch will be delivered in May. |
− | **: Ordered 18000 of polycarbonate donats | + | **: Ordered 18000 of polycarbonate donats. Will be available in 3 - 4 weeks. |
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> | <!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> | ||
** Fabricated modules: <span style="color:#FF0000"> Total 1487 </span> | ** Fabricated modules: <span style="color:#FF0000"> Total 1487 </span> | ||
− | **: Available for fabrication: | + | **: Available for fabrication: 31 |
− | **: Fabricate | + | **: First summer students (Madison and Madylin) are in the Lab. Fabricate 26 modules using 'low quality' crystals for the stacking mockup and 'crash' tests. Have low-quality crystals for 42 test modules. |
− | * '''[[Testing of PMT dividers]]''' -- Sasha | + | * '''[[Testing of PMT dividers]]''' -- Sasha |
** FCAL2 modules with dividers installed on the CCAL [https://logbooks.jlab.org/entry/4140983] | ** FCAL2 modules with dividers installed on the CCAL [https://logbooks.jlab.org/entry/4140983] | ||
− | ** Met with Vlad P. on Tuesday. Fine tuned the divider circuit | + | ** Met with Vlad P. on Tuesday. Fine tuned the divider circuit. Checking/tuning an amplifier; Chris S. ordered some OPS. |
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] |
Revision as of 09:16, 5 May 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals:
- Received 30 crystals from CRYTUR [1]. Remaining 65 crystals will be sent to us during this and next month.
- Wrapped crystals ready for fabrication (Mindy): 26 SICCAS and 5 CRYTUR = 31
- Available for wrapping: 10 SICCAS + 28 CRYTUR = 38
- George (DSG group) preshaped 96 ESR reflectors; finished with preshaping.
- More than 200 long signal cables received, can start checking, bundling, labeling
- Procurement parts for the LMS
- Ordered 16,000 + 8,000 = 24,000 ft of optical fibers. Expect that the first batch will be delivered in May.
- Ordered 18000 of polycarbonate donats. Will be available in 3 - 4 weeks.
- Crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1487
- Available for fabrication: 31
- First summer students (Madison and Madylin) are in the Lab. Fabricate 26 modules using 'low quality' crystals for the stacking mockup and 'crash' tests. Have low-quality crystals for 42 test modules.
- Fabricated modules: Total 1487
- Testing of PMT dividers -- Sasha
- FCAL2 modules with dividers installed on the CCAL [2]
- Met with Vlad P. on Tuesday. Fine tuned the divider circuit. Checking/tuning an amplifier; Chris S. ordered some OPS.
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [3]
- Discussion of the FCAL2 installation procedures [4]
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Light Monitoring System -- Arshak
- Preparation of parts for FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- PMT divider updates
- Light Monitoring System -- Arshak
- Simulations/Analysis
- GUINEAPIG Workshop?