Difference between revisions of "JEF meeting, March 28, 2025"
From GlueXWiki
Line 17: | Line 17: | ||
[https://halldweb.jlab.org/detectors/fcal2/ps_test_setup Preparing prototype] | [https://halldweb.jlab.org/detectors/fcal2/ps_test_setup Preparing prototype] | ||
− | + | ** [[PS test setup]] | |
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All | ||
'''Calibrations''' | '''Calibrations''' |
Revision as of 08:51, 28 March 2025
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Installation of the FCAL2 detector & integration to GlueX -- Sasha, All
Preparing for the run -- Sasha
- Reconfiguring MPODs for LV power supply
- Check mapping of ECAL modules
- Final check of the detector
Restoring PS test setup [1]
ECAL commissioning -- Sasha, All
Calibrations