Difference between revisions of "JEF meeting, March 28, 2025"

From GlueXWiki
Jump to: navigation, search
Line 17: Line 17:
  
 
[https://halldweb.jlab.org/detectors/fcal2/ps_test_setup Preparing prototype]
 
[https://halldweb.jlab.org/detectors/fcal2/ps_test_setup Preparing prototype]
 
+
** [[PS test setup]]
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
  
 
'''Calibrations'''
 
'''Calibrations'''

Revision as of 08:51, 28 March 2025

Connection

Meeting time and location:

Agenda

Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

Preparing for the run -- Sasha

    • Reconfiguring MPODs for LV power supply
    • Check mapping of ECAL modules
    • Final check of the detector

Restoring PS test setup [1]

Preparing prototype

ECAL commissioning -- Sasha, All

Calibrations