Difference between revisions of "2012-04-18"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday April 18, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room L104. == Me...") |
(→Agenda) |
||
Line 27: | Line 27: | ||
== Agenda == | == Agenda == | ||
* Announcements | * Announcements | ||
− | ** | + | ** [[GlueX-Upgrade-May-2012|Upgrade Workshop]]on May 2 |
− | + | ** [[GlueX-Collaboration-Jun-2012|Collaboration Meeting]] May 21,22,23 | |
− | ** Collaboration Meeting May 21,22,23 | + | |
* Reviews and Reports | * Reviews and Reports | ||
** Updated 12-GeV Physics Case | ** Updated 12-GeV Physics Case |
Revision as of 11:42, 17 April 2012
Meeting Time and Place
The meeting will be on Wednesday April 18, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room L104.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
- Announcements
- Upgrade Workshopon May 2
- Collaboration Meeting May 21,22,23
- Reviews and Reports
- Updated 12-GeV Physics Case
- Software Review
- PAC Preparations
- MOU and Contract Status
- MOU Status
- ASU
- Construction Contracts
- CUA
- FIU
- FSU
- UCONN
- UMass
- MOU Status
- Beam Tests
- Reports from Technical Groups.
- Calorimeters
- Calorimetry Mar 27, 2012
- BCAL Readout Apr 3, 2012
- Technical Design Report
- Tracking March 28, 2012
- CDC
- FDC
- Technical Design Report
- TOF March 29, 2012
- Technical Design Report
- Start Counter March 22, 2012
- Technical Design Report
- Engineering
- Magnet
- Target
- Engineering Activities
- Technical Design Report
- Electronics
- Technical Design Report
- Trigger March 28, 2012
- Technical Design Report
- DAQ/Monitoring/Controls March 28, 2012
- Technical Design Report
- Offline
- Software Meeting March 21, 2012
- Tracking Software March 14, 2012
- Technical Design Report
- Photon Beam and Tagger April 2, 2012
- Technical Design Report
- Physics March 26, 2012
- Calorimeters
- AOT