Difference between revisions of "Photon Beam Commissioning Discussion July 23, 2014"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 32: | Line 32: | ||
##Regarding minimum deliverable current: | ##Regarding minimum deliverable current: | ||
{| class="wikitable" style="text-align: center; color: black;" | {| class="wikitable" style="text-align: center; color: black;" | ||
− | | | + | |Stripline BPM Resolutions |
|≥ 30nA 100um resolution | |≥ 30nA 100um resolution | ||
|< 30nA resolution suffers(position noisy barring additional filtering) | |< 30nA resolution suffers(position noisy barring additional filtering) |
Revision as of 13:15, 23 July 2014
Organization
- Time: 4 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
- Hall D Commissioning Pages
- DRAFT Accelerator Hall D Beam Delivery Procedures(V.1b9)
- DRAFT Accelerator Tagger Magnet Operation Procedures(V. 0)
- DRAFT Accelerator Hall D Ion Chamber Functional Test Procedure(V.1b3)
- DRAFT Accelerator Hall D Ion Chamber Calibration Procedure(V.1b2)
Action Items
- Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha says he will do this
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Alexandre for Hall D)
Agenda
- Announcements
- Electron Commissioning (Todd/Mike)
- Hall D Beam Delivery Procedure heading to Rev. 10 with feedback received.
- Ion Chamber Procedures currently under review for release for use.
- Eugene/Curtis added as administrators for Hall D Operational Restrictions[1]
- System Experts requested to write test plans for nA BPM, FFB, and Active Collimator hardware commissioning.
- Cross Calibration Procedure for absolute current measurement desired?
- Point of contact in Radcon for measurement test plan for fall? (George or Pavel perhaps?)
- Regarding minimum deliverable current:
Stripline BPM Resolutions | ≥ 30nA 100um resolution | < 30nA resolution suffers(position noisy barring additional filtering) | 3nA yields expected resolution ≈ 300 µm |
- Photon Commissioning Draft (Alexandre)
- Radiation monitors
- Aug 8 Review:
- Other business
Minutes
Attending:'