Run Coordination Meetings:Fall2022
Contents
[hide]- 1 Fall 2022 Run
- 2 Meeting General Agenda
- 3 Connect Information
- 4 Beam and Hall configuration
- 5 General Information
- 6 Runplan
- 7 Hall D situation room (current run plan)
- 8 Runplan time charts
- 9 Accelerator status
- 10 Setting Up Photon Beam
- 11 Hot Checkout
- 12 Readiness for Fall 2022 Run
- 13 Live Camera Feeds from the Four Counting Houses
- 14 Running Shifts Remote
Fall 2022 Run
PrimEx experiment (August 27 - December 19)
Meeting General Agenda
Run planning meetings:
Run Planning Meeting Notes, August 18 - August 23, 2022
Run Planning Meeting Notes, August 24 - August 31, 2022
Connect Information
To connect from the outside by phone please do the following
1.) To join via ZoomGov: connect Meeting ID: 160 199 0060 / Passcode 8394
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
4.) The moderator code is 8394
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Specific instructions for connecting from JLab's Hall D conference room:
- Turn polycon on if necessary (do it before turning the computer on)
- With the polycon, place a call at 199.48.152.152
- Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
- You may have to unmute the microphone: #*4
- Turn the computer on if needed
Beam and Hall configuration
- Beam energy expected:
- 11.57 GeV
- Solenoid:
- 1350 A
- CW Beam:
- 250 MHz frequency
- 50 - 200 nA (production runs), 400 nA maximum (rate scans), < 5 nA during calibration runs
- Radiators:
- Goniometer radiators:
- Amorphous:
- 10 µm Al (11.2·10-5 R.L.)
- 1.64 µm Al (1.86·10-5 R.L.) calibration
- Tagger quadrupole on (-4.2 A).
- Collimator hole: Default running: 5.0 mm.
- Targets:
- 4He target: cryogenic target
- Be target
- PS converter: 750 μm
- Miscellaneous:
- PS test area:
- Right arm: Setup to check PbWO4 crystals and calorimeter modules / prototypes
- PS test area:
General Information
This document describes the run plan for the Hall D Fall 2022 run.
- Schedule for the run:
- August 18 - August 26 (change detector configuration from CPP to PrimEx)
- August 27: beam restoration
- December 19 (7 am): end of the run
- Accelerator overall plan and priorities:
- Hall D plan
- Experiment:
- PrimEx
- 2 TAC Runs
- Empty Target Runs
- Expected Staffing and responsibilities:
- The Run Coordinator oversees the run:
- August 18 - August 23: 14 days: Liping Gan (detector configuration change)
- August 24 - August 30: 14 days: Igal Jaegle (detector configuration, accelerator restoration)
- August 31 - September 6: Stuart Fegan
- September 7 - September 13: TDB
- September 14 - September 20: Arshak Asaturyan
- September 21 - September 27: TBD
- September 28 - October 4: TBD
- October 5 - October 11: Joerg Reinhold
- October 12 - October 18: TBD
- October 19 - October 25: Arshak Asaturyan
- October 26 - November 1: Igal Jaegle
- November 2 - November 8: Olga Cortes Becerra
- November 9 - November 15: Mariana Khachatryan
- November 16 - November 22: TDB
- November 23 - November 29: TDB
- November 30 - December 6: TBD
- December 7 - December 13: TBD
- December 14 - December 20: TBD
- (Last day of Primex running December 19)
- The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:
- PDL: Lubomir Penchev
- The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.
- Shifts: 2 person shifts: 1 local leader and 1 (optionally remote) worker scheduled through the GlueX shift scheduler.
- The Run Coordinator oversees the run:
- Coordination Activities:
- The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
- Run meetings: broadcasted on Bluejeans. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.
- Start of run: Daily meetings
- Production: Alternate nominal length meetings (Monday/Thursday) with short meetings (Tuesday, Wednesday, Friday)
- Useful links:
- Accelerator schedule and information
- Link to Richard Jones program to plot the beam profile at the collimator.
- Links to previous runplans
- Web-accessible EPICS information
- Links to beam parameters/radiation level monitoring:
- Last 8-hours plots showing 1-minute, 10-minute, and hourly averages
- Same but Last 24-hours
- Same but Last 72-hours
- Week, month, and quarter (3 months) plots also exist, with similar web addresses.
- A map of the radiation monitors
Runplan
Hall D situation room (current run plan)
Short Term Run Plan (To be updated)
Hall D counting room white board camera
Runplan time charts
Fall 2022 time charts:
Accelerator status
- Link to accelerator short term schedule (White board)
- Link to accelerator SAD calendar
- 07:45 M-F PD/RC meeting zoom
- 08:00 M-F & 13:30 Wed MCC mettings zoom
Setting Up Photon Beam
- Verify electron beam quality and establish photon beam
- Ion Chambers trip threshold must be set using 3 Al. radiators on the amorphous radiator ladder
- Tune electron beam with radiator retracted
- Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position.
- Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
- RAD102_P1 ~ 10 mrad/hr (tagger area, gammas, between tagger and dump)
- RAD102_P2 ~30 mrad/hr (tagger area, gammas, on the ground below the goniometer).
- RAD102_P3 ~ 0.3 mrem/hr (tagger area, neutrons, near electronics racks)
- RAD508_P1 < 0.1 mrad/hr (collimator cave, gammas).
- RAD508_P2 ~ 0. mrad/hr (Hall. Neutrons).
- Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
- Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position.
- Establish good photon beam
- Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is in power/beam permit.)
- Insert 2*10-5 RL radiator. Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved
- Typical levels are (for 2×10-5 radiator, electron beam current 50 nA)
- RAD102_P1= 35 mrad/hr (tagger area, gammas, between tagger and dump)
- RAD102_P2= ~ 50 mrad/hr (tagger area, gammas, on the ground below the goniometer)
- RAD102_P3= ~2 mrem/hr (tagger area, neutrons, near electronics racks)
- RAD508_P1= ~10 mrad/hr (collimator cave, gammas).
- RAD508_P2 < ~ 0. mrad/hr (Hall. Neutrons).
- Typical levels are (for 2×10-5 radiator, electron beam current 50 nA)
- Insert 2*10-5 RL radiator. Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved
- Verify beam position and envelope (Hovanes).
- Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.
- Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, see instruction. If it looks good, proceed to next step. Otherwise, inform MCC.
- Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10-4 radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
- Radiation level study (1h, collimator at 5mm):
- Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA. There is need to run the DAQ or stop the beam between each steps: the data are recorded by EPICS. However, the beam need to be off when moving to a different radiator for the next steps.
- Run 5 min with the 10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
- Run 3 min with the 3*10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
- Photon flux optimization and Active Collimator calibration. Call Hovanes.
- re-Insert the 10-4 radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
- Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)
- Repeat procedure with 2*10-5 radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.
- Record on the white board what is the beam position on 5C11b and Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.
- Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
Hot Checkout
To be completed by XXX.
100% ready ; 0% checked ; 0% not ready
Readiness for Fall 2022 Run
- Solenoid (Eugene/Beni)
- Start the run with magnetic field on
- Surveys (Tim/Mark)
- FCAL survey
- TOF syrvey
- ST syrvey
- TAGM
- TAGH
- Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
- Survey CCAL after it's installed in the Hall
- DAQ (Sergei).
- Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
- Trigger (Alex S.)
- Check physics triggers
- Run CCAL trigger when the detector is installed in the Hall
- Connect / check CCAL LED and alpha triggers
- Beam line
- Install He beam pipe between FCAL and CCAL (Tim)
- Install led shielding wall in front downstream the PS (Tim)
- Radiator status
- Check amorphous radiator
- Tagger hodoscope (A. Somov)
- Install plates with TAGH counters
- Install / check repaired TAGH countes
- Tagger microscope (Tim / Richard Jones)
- Move TAGM to the new location and rotate
- Collimator Motion (Hovanes)
- Not changed
- Active collimator detectors(Richard Jones/Alexandre Deur)
- Move active collimator to 5 mm hole
- Check
- Profiler (Hovanes)
- Not changed
- Luminosity monitor (Hovanes)
- Not changed
- Halo monitors
- Not changed
- PS system (Alex Somov)
- Not changed
- Beam line magnets (PS magnet sweeping magnet and tagger quads).
- Change filed of the PS magnet
- Polarimeter (Sebastian Cole/M. Dugger)
- Optional, not used in PrimEx
- Targets (Chris/Tim/Alexandre D.)
- LH4
- Be
- TAC (Alex Somov/Hovanes)
- Use CCAL (TAC can be used as a backup)
- Slow control (Hovanes)
- Check CCAL
- RF (Sergei)
- Not changed
- Radiation monitors (Alexandre D.)
- Not changed
- Detector systems
- ST (Beni)
- Connect cables, check dark rate
- FDC (Lubomir)
- Not changed
- CDC (Beni)
- Move CDC1 crate to the nominal position, cable up
- Check readout
- BCal (Mark D. / Elton)
- Not changed
- FCal (Mark D.)
- Check / replace bases if needed
- ComCal (Alex Somov)
- Check detector controls (Nick)
- Install CCAL platform
- Check platform motion
- Installed detector on the platform
- Connect cables
- Connect LMS
- Check detector
- TOF (Beni)
- Remove inner acrylic absorber
- ST (Beni)
- RSAD and ESAD Safety documents, to be updated (Lubomir):
- Phones
- System experts should have found their on-call phones by now.
- System experts should have their phone charged.
- System experts should start carrying their (charged) phone.
- Hall Status/safety (Mark/Tim)
- Other topics?
Live Camera Feeds from the Four Counting Houses
- These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.
- Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.