Feb 7, 2012 Readout
From GlueXWiki
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting
-
Jlab (Yi) and USM (Hayk) will make available raw spectra for fitting by other groups to check consistency.- Yi forwarded fits of USM data from Dec 5 to Zisis
- See e-mail Jan 30
Presentations from recent meetings
Tentative Agenda
- Announcements
- Review of Action Items
- Calorimetry Talks at the Collaboration Meeting
- Friday Feb. 17, 13:30 Session IVa (120) --- Calorimetry - (Organizer: Zisis Papandreou ) - Chair
- Update from USM
- Status of Testing at JLab
- BCAL Beam Test
- Other
Minutes
Attending: Elton, Eugene, John L., John C., Yi, Sasha, Beni (Jlab); Will, Hayk, Javiera, Orlando Soto (USM); Zisis, George, Andrei (UofR); Christina (Athens).
- Announcements
- Review of Action Items
- Calorimetry Talks at the Collaboration Meeting
- Friday Feb. 17, 13:30 Session IVa (120) --- Calorimetry - (Organizer: Zisis Papandreou ) - Chair
- Four talks scheduled. Offline will be discussed how the information is presented on the SiPM
- Friday Feb. 17, 13:30 Session IVa (120) --- Calorimetry - (Organizer: Zisis Papandreou ) - Chair
- BCAL Beam Test
- Electronics (Sasha)
- On hand: 48 channels of FlashADCs (Need: 32 channels for miniBcal + trigger and spares)
- On hand: 32 channels of F1 TDC (Need: 32 channels from Beni)
- On hand: 16 channels of Discriminator (Need: 32 channels, need to secure one more)
- On hand: NIM bin + logic available
- Need: trigger scintillators
- Need: additional VXS crates, etc unless we can share with Fcal
- Schedule (John)
- Next week Fcal and Hall B will conduct a joint test to establish electron energies into detector
- 1-2 Weeks electron beam test
- 1-2 weeks 2 pass photon beam
- Target change, mid March
- 1-2 weeks 3 pass photon beam
- Remainder of time 5 pass photon beam (April/May)
- Fcal would like to accumulate data in alcove at three energies
- Perform all Flash DAQ tests before moving down to Hall B floor
- Paperwork (Zisis)
- Prepare executive summary in the next few days so that Eugene can talk to Volker
- DRAFT Proposal will follow later this week for feedback
- Electronics (Sasha)
- Update from USM
- Status of Testing at JLab
- Other