Difference between revisions of "Π polarizability Meeting Nov 14, 2013"
From GlueXWiki
(One intermediate revision by the same user not shown) | |||
Line 39: | Line 39: | ||
=Minutes= | =Minutes= | ||
− | Attendees: '' | + | Attendees: ''Rory M., Sean M., Ali, Megan, Elton S., Mark I., David L.'' |
+ | |||
+ | ==Next meeting== | ||
+ | We'll meet next on Dec. 5th (skip Thanksgiving) | ||
+ | |||
+ | == Prioritization PAC == | ||
+ | * Elton thinks they are scheduling it in May (before regular PAC) | ||
+ | * Want a second workshop in April | ||
+ | ** first workshop was theory focussed | ||
+ | ** second workshop should focus on experimental aspects (beam line, software, detectors, ...) | ||
+ | * Prioritization PAC may look closely at readiness | ||
+ | * they will be trying to decide which experiments to run (they won't try changing scientific ratings) | ||
+ | |||
+ | |||
+ | == Spring APS meeting == | ||
+ | * Invited session approved for hadron polarizabilities (Volker Crede) | ||
+ | * Rory is considering several options for speakers given the constraints of APS rules | ||
+ | |||
+ | |||
+ | == GARFIELD Simulations == | ||
+ | * Simulations were done using 90%/10% Ar/CO2 | ||
+ | * Field calculated assuming 10^5 gain using parameterization from Mac | ||
+ | ** voltage on sense wire was ~1875V | ||
+ | * Original geometry had 1cm half-gap (1cm between sense wire and field wire) | ||
+ | * Maximum drift time (corresponding to 0.95cm from sense wire) was ~1μs | ||
+ | * Also looked at 5mm half-gap and 7.5mm half-gap | ||
+ | * For 5mm half-gap, maximum drift time was close to 500ns | ||
+ | * Currently investigating gas mixture 80/20 (some issues with GARFIELD crashing) | ||
+ | * Need to investigate what kind of spatial resolution we need to separate πs and μs | ||
+ | |||
+ | == JLab experiment HPS == | ||
+ | * Also need to separate πs and μs | ||
+ | * Looking for e+e- and μ+μ- vertices | ||
+ | * They are considering layers of iron and scintillator | ||
+ | ** wave-shifting readout (fibers to multi-channel PMT) | ||
+ | ** currently unfunded (MRI proposal written) | ||
+ | * Rory will communicate with some of the folks involved to find out where they are at and what they are thinking | ||
+ | |||
+ | == Next Meeting == | ||
+ | * How big do the detectors need to be? | ||
+ | ** 2mx2m ? | ||
+ | ** smaller is more convenient for restricted space | ||
+ | * How many layers? | ||
+ | |||
+ | |||
+ | == Misc == | ||
+ | * David will send Megan ROOT file with generated events |
Latest revision as of 15:41, 14 November 2013
Contents
Meeting Info.
Meeting Time And Location
2:00pm EST (JLab time)
CEBAF Center F226 (definitely)
Connecting
We will use ReadyTalk phone conferencing. Here are the instructions:
- dial the appropriate number
- +1-866-740-1260 : US and Canada
- 0800-6645316 : Germany
- A complete list of toll-free international numbers can be found here.
- Enter the participant code: 3421244# (the # is needed when using the phone)
If there is a problem connecting via ReadyTalk, we'll use Skype as a backup. The relevant Skype user names are:
- Rory Miskimen - rmiskimen
- Alexander Mushkarenkov - alexander_mushkarenkov
- Elton Smith - eltonssmith
- David Lawrence - aehsdad
some phone numbers if needed:
David: (757) 269-5567 (cell: 757-746-6697) Rory: (413) 545-2480
Agenda
- Previous meeting: Oct 31, 2013
- Announcements
- GARFIELD calculations (Sean M.)
- AOT
Minutes
Attendees: Rory M., Sean M., Ali, Megan, Elton S., Mark I., David L.
Next meeting
We'll meet next on Dec. 5th (skip Thanksgiving)
Prioritization PAC
- Elton thinks they are scheduling it in May (before regular PAC)
- Want a second workshop in April
- first workshop was theory focussed
- second workshop should focus on experimental aspects (beam line, software, detectors, ...)
- Prioritization PAC may look closely at readiness
- they will be trying to decide which experiments to run (they won't try changing scientific ratings)
Spring APS meeting
- Invited session approved for hadron polarizabilities (Volker Crede)
- Rory is considering several options for speakers given the constraints of APS rules
GARFIELD Simulations
- Simulations were done using 90%/10% Ar/CO2
- Field calculated assuming 10^5 gain using parameterization from Mac
- voltage on sense wire was ~1875V
- Original geometry had 1cm half-gap (1cm between sense wire and field wire)
- Maximum drift time (corresponding to 0.95cm from sense wire) was ~1μs
- Also looked at 5mm half-gap and 7.5mm half-gap
- For 5mm half-gap, maximum drift time was close to 500ns
- Currently investigating gas mixture 80/20 (some issues with GARFIELD crashing)
- Need to investigate what kind of spatial resolution we need to separate πs and μs
JLab experiment HPS
- Also need to separate πs and μs
- Looking for e+e- and μ+μ- vertices
- They are considering layers of iron and scintillator
- wave-shifting readout (fibers to multi-channel PMT)
- currently unfunded (MRI proposal written)
- Rory will communicate with some of the folks involved to find out where they are at and what they are thinking
Next Meeting
- How big do the detectors need to be?
- 2mx2m ?
- smaller is more convenient for restricted space
- How many layers?
Misc
- David will send Megan ROOT file with generated events