Difference between revisions of "2012-10-31"
From GlueXWiki
(→Reports from Technical Groups) |
|||
(4 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
+ | [[File:Jackolantern.jpg|300px]] | ||
== <span style="color:#FF8C00">Meeting Time and Place </span> == | == <span style="color:#FF8C00">Meeting Time and Place </span> == | ||
− | <span style="color:#FF8C00"> | + | The meeting will be on Wednesday <span style="color:#FF8C00">October 31</span>, 2012 at 11:00am EDT. |
For those people at Jefferson Lab, the meeting will be in room | For those people at Jefferson Lab, the meeting will be in room | ||
− | F326. | + | F326. |
− | == Meeting Connections == | + | == <span style="color:#FF8C00">Meeting Connections</span> == |
To connect from the outside: | To connect from the outside: | ||
Line 25: | Line 26: | ||
* [http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html Skype Bridge] to EVO | * [http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html Skype Bridge] to EVO | ||
− | == Agenda == | + | == <span style="color:#FF8C00">Agenda</span> == |
− | === Announcements === | + | === <span style="color:#FF8C00">Announcements</span> === |
# Monthly Installation Meetings will start on Monday November 12. | # Monthly Installation Meetings will start on Monday November 12. | ||
# Software Review Follow-up postponed. | # Software Review Follow-up postponed. | ||
− | === MOU and Contract Status === | + | === <span style="color:#FF8C00">MOU and Contract Status</span> === |
* [[Private:MOU Status | MOU Status]] | * [[Private:MOU Status | MOU Status]] | ||
** Glasgow | ** Glasgow | ||
Line 40: | Line 41: | ||
** UCONN | ** UCONN | ||
− | === Technical Design Report === | + | === <span style="color:#FF8C00">Technical Design Report</span> === |
# TDR Editor in progress.... | # TDR Editor in progress.... | ||
− | === Reports from Technical Groups === | + | === <span style="color:#FF8C00">Reports from Technical Groups</span> === |
* Calorimeters | * Calorimeters | ||
** Calorimetry [[Oct 23, 2012 Calorimetry|October 23, 2012]] | ** Calorimetry [[Oct 23, 2012 Calorimetry|October 23, 2012]] | ||
− | ** BCAL Readout [[Oct 30, 2012 Readout|October 30, 2012]] | + | ** BCAL Readout [[Oct 30,2012 Readout|October 30, 2012]] |
* Tracking [[October 24, 2012 tracking CDC/FDC| October 24, 2012]] | * Tracking [[October 24, 2012 tracking CDC/FDC| October 24, 2012]] | ||
** CDC | ** CDC | ||
Line 65: | Line 66: | ||
** Software Meeting [[GlueX Offline Meeting, October 17, 2012#Minutes|October 17, 2012]] | ** Software Meeting [[GlueX Offline Meeting, October 17, 2012#Minutes|October 17, 2012]] | ||
** Data Challenge [[GlueX Data Challenge Meeting, October 22, 2012|October 22, 2012]] | ** Data Challenge [[GlueX Data Challenge Meeting, October 22, 2012|October 22, 2012]] | ||
− | * Photon Beam and Tagger | + | * Photon Beam and Tagger |
* Physics [[October 22, 2012 (11:30AM), Physics Working Group|October 22, 2012]] | * Physics [[October 22, 2012 (11:30AM), Physics Working Group|October 22, 2012]] | ||
− | === AOT === | + | === <span style="color:#FF8C00">AOT</span> === |
Latest revision as of 11:18, 31 October 2012
Contents
Meeting Time and Place
The meeting will be on Wednesday October 31, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
Announcements
- Monthly Installation Meetings will start on Monday November 12.
- Software Review Follow-up postponed.
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
- UCONN
Technical Design Report
- TDR Editor in progress....
Reports from Technical Groups
- Calorimeters
- Calorimetry October 23, 2012
- BCAL Readout October 30, 2012
- Tracking October 24, 2012
- CDC
- FDC
- PID
- TOF October 25, 2012
- Start Counter October 18, 2012
- PID Upgrades October 19, 2012
- Engineering
- Magnet
- Target
- Engineering Activities
- Electronics
- Technical Design Report
- Trigger October 24, 2012
- DAQ/Monitoring/Controls October 24, 2012
- Offline
- Software Meeting October 17, 2012
- Data Challenge October 22, 2012
- Photon Beam and Tagger
- Physics October 22, 2012