Difference between revisions of "2013-10-30"

From GlueXWiki
Jump to: navigation, search
(Reports from Technical Groups)
(Reports from Technical Groups)
Line 36: Line 36:
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
 
* Calorimeters:
 
* Calorimeters:
** Calorimetry [[Oct 8, 2013 Calorimetry| October 8, 2013]]
+
** Calorimetry [[Oct 22, 2013 Calorimetry| October 22, 2013]]
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-10-15 | October 15, 2013]]
+
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-10-29 | October 29, 2013]]
* Tracking [[October 9, 2013 tracking CDC/FDC| October 9, 2013]]
+
* Tracking [[October 23, 2013 tracking CDC/FDC| October 23, 2013]]
 
** CDC --- transport to Jefferson Lab on October 29.
 
** CDC --- transport to Jefferson Lab on October 29.
 
** FDC  
 
** FDC  
 
* PID  
 
* PID  
 
** TOF [[GlueX TOF Meeting, October 10, 2013|October 10, 2013]]  
 
** TOF [[GlueX TOF Meeting, October 10, 2013|October 10, 2013]]  
** Start Counter [[GlueX Start Counter Meeting, September 19, 2013#Minutes|September 19, 2013]]
+
** Start Counter [[GlueX Start Counter Meeting, October 17, 2013#Minutes|October 17, 2013]]
** PID Upgrades [[September 20, 2013 PID Upgrade|September 20, 2013]]
+
** PID Upgrades [[October 18, 2013 PID Upgrade|October 18, 2013]]
 
* Calibration
 
* Calibration
 
* Engineering  
 
* Engineering  
Line 53: Line 53:
 
* Electronics
 
* Electronics
 
* Trigger  
 
* Trigger  
** Hardware (Level-1) [[OWG Meeting 9-Oct-2013 |October 9, 2013]]
+
** Hardware (Level-1) [[OWG Meeting 23-Oct-2013 |October 23, 2013]]
 
** Software (Level-3) [[October 15, 2013| October 15, 2013]]
 
** Software (Level-3) [[October 15, 2013| October 15, 2013]]
* DAQ/Monitoring/Controls [[OWG Meeting 9-Oct-2013 |October 9, 2013]]
+
* DAQ/Monitoring/Controls [[OWG Meeting 23-Oct-2013 |October 23, 2013]]
 
* Offline [[GlueX Offline Meeting, September 18, 2013|September 18, 2013]]
 
* Offline [[GlueX Offline Meeting, September 18, 2013|September 18, 2013]]
 
** Software Review Planning
 
** Software Review Planning
* Photon Beam and Tagger [[BLTWG Meeting 10/14/2013|October 14, 2013]]
+
* Photon Beam and Tagger [[BLTWG Meeting 10/28/2013|October 28, 2013]]
* Physics [[September 23, 2013, Physics Working Group|September 23, 2013]]
+
* Physics [[October 21, 2013, Physics Working Group|October 21, 2013]]

Revision as of 14:00, 29 October 2013

Meeting Time and Place

The meeting will be on Wednesday October 30, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Polycom RealPresence App on iOS and Android:

   Call 8542553@gk1.es.net

3.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

Agenda

Announcements

MOU and Contract Status

Reports from Technical Groups