Difference between revisions of "Apr 7, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
Line 18: Line 18:
 
# Preamp-summing (Fernando)
 
# Preamp-summing (Fernando)
 
#* Will present a discussion of cabling and grounding next week.
 
#* Will present a discussion of cabling and grounding next week.
# Discussion of production testing (Elton)
+
# Discussion of production testing
  
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:

Revision as of 18:16, 6 April 2011

References

Action Items from previous meetings

  1. Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. First article testing (Carl and Yi)
  5. Mechanical cooling (Jim)
    • Review status of drawings for prototype (Chuck)
  6. Temperature compensation (Jack)
  7. Preamp-summing (Fernando)
    • Will present a discussion of cabling and grounding next week.
  8. Discussion of production testing

Minutes

Attending: