Difference between revisions of "August 20, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(10 intermediate revisions by 3 users not shown)
Line 19: Line 19:
 
#* New meeting time for Fall semester: Mondays at 1 pm
 
#* New meeting time for Fall semester: Mondays at 1 pm
 
# Optical box
 
# Optical box
#* Mechanical installation (Tim, All)
+
#* Successful mechanical installation (Tim, Ernie, All)
 
#** Logbook [https://logbooks.jlab.org/entry/3587439] [https://logbooks.jlab.org/entry/3587832] [https://logbooks.jlab.org/entry/3587462]
 
#** Logbook [https://logbooks.jlab.org/entry/3587439] [https://logbooks.jlab.org/entry/3587832] [https://logbooks.jlab.org/entry/3587462]
 
#* Fabrication status update (Ernie and Jason)
 
#* Fabrication status update (Ernie and Jason)
 
#** Quartz window flange modification
 
#** Quartz window flange modification
 
#** Mirror cutting and installation
 
#** Mirror cutting and installation
#* Dark box enclosure (Jason)
+
#** Dark box enclosure (Jason)
 
#* Plans for ESB and full installation:[[Media:Aug10_OB_delivery.pdf|testing and installation schedule]]  
 
#* Plans for ESB and full installation:[[Media:Aug10_OB_delivery.pdf|testing and installation schedule]]  
 
#** Mirror box laser alignment [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_Aug_02.pdf geometry and laser projections] (Bill/Stephanie)
 
#** Mirror box laser alignment [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_Aug_02.pdf geometry and laser projections] (Bill/Stephanie)
 
# DAQ integration
 
# DAQ integration
#* Sergey successfully read out SSP with 2 FPGA boards in DIRC crate with production DAQ!
+
#* Sergey successfully read out SSP with 2 FPGA boards in DIRC crate with production DAQ
 
#* David Lawrence is developing EVIO parser based on this data, then a translation table will be developed
 
#* David Lawrence is developing EVIO parser based on this data, then a translation table will be developed
# Software/simulations
 
#* Software overview and tasks
 
#* Finalizing DIRC "as-build" geometry: support frames, etc. (Yunjie)
 
 
# MAPMT testing  
 
# MAPMT testing  
 
#* Magnetic field test initial results (Bill and Andrew)
 
#* Magnetic field test initial results (Bill and Andrew)
# [[Fall 2018 DIRC Commissioning|Commissioning plans]]
+
#* [https://halldweb.jlab.org/wiki/images/e/e4/Mag_test_8_20_update.pdf Magnetic Field Test Update] (Andrew)
 +
# Software/simulations
 +
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 +
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. ([https://halldweb.jlab.org/wiki/images/f/fa/As_built_geometry_update.pdf Yunjie])
 +
#* Simulation samples for [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview#Simulation_samples simulation samples]: [https://halldweb.jlab.org/wiki/images/c/c1/DIRC_Reco_8.20.18.pdf initial study] (Justin)
 
# Reminder: [[Addressing ERR review recommendations]]
 
# Reminder: [[Addressing ERR review recommendations]]
 
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
 
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
 
# AOB
 
# AOB

Latest revision as of 13:04, 20 August 2018

Meeting Information

GlueX DIRC Meeting
Monday August 20, 2018
2:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • New meeting time for Fall semester: Mondays at 1 pm
  2. Optical box
  3. DAQ integration
    • Sergey successfully read out SSP with 2 FPGA boards in DIRC crate with production DAQ
    • David Lawrence is developing EVIO parser based on this data, then a translation table will be developed
  4. MAPMT testing
  5. Software/simulations
  6. Reminder: Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
  7. AOB