Difference between revisions of "Calibration-Monitoring"

From GlueXWiki
Jump to: navigation, search
(Monitoring System)
Line 3: Line 3:
 
* [[Monitoring R&D]] issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems.
 
* [[Monitoring R&D]] issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems.
 
* [[Monitoring System Requirements]]: table of parameters and requirements.
 
* [[Monitoring System Requirements]]: table of parameters and requirements.
 +
* [http://www.jlab.org/Hall-D/software/wiki/index.php/Sep_2%2C_2008_Calorimetry#Calibration_Specifications_Table Calibration Specifications Table] for BCAL, FCAL, TOF and START
  
 
=== Updates and Drawings ===
 
=== Updates and Drawings ===
Line 11: Line 12:
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1059 Status report on the UoA calibration system tests GlueX-doc-1059]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1059 Status report on the UoA calibration system tests GlueX-doc-1059]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1051 Summary LED Measurements GlueX-doc-1051]
 
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1051 Summary LED Measurements GlueX-doc-1051]
 
=== Specifications Table ===
 
* [http://www.jlab.org/Hall-D/software/wiki/index.php/Sep_2%2C_2008_Calorimetry#Calibration_Specifications_Table Calibration Specifications Table] for BCAL, FCAL, TOF and START
 
  
 
=== Initial System Concept ===
 
=== Initial System Concept ===
Line 21: Line 19:
 
* [[Media:Tests01_ULab2.pdf]]
 
* [[Media:Tests01_ULab2.pdf]]
 
* [[Media:LED_Pulser_Control_Module.pdf]]
 
* [[Media:LED_Pulser_Control_Module.pdf]]
 
== Calibration ==
 
  
 
Under construction: the physics simulations that promise to provide a calibration of the BCAL will be added here in the near future.
 
Under construction: the physics simulations that promise to provide a calibration of the BCAL will be added here in the near future.

Revision as of 18:45, 8 December 2010

Monitoring System

Updates and Drawings

Initial System Concept

The content in the three attachments below was presented by the Athens group on May 5, 2008.

Under construction: the physics simulations that promise to provide a calibration of the BCAL will be added here in the near future.

Meetings