= Agenda =
 +
 
* Announcements
 
* Announcements
 
* Minutes from previous meeting [[Controls Meeting 1-May-2014]]
 
* Minutes from previous meeting [[Controls Meeting 1-May-2014]]
 
* Gas system control in PLC [[Media:FDC_Gas.pptx‎]] (Dave)
 
* Gas system control in PLC [[Media:FDC_Gas.pptx‎]] (Dave)
 
* EPICS GUIs for the gas system [[CDC/FDC_Gas_System_GUI]](Mike)
 
* EPICS GUIs for the gas system [[CDC/FDC_Gas_System_GUI]](Mike)
* [[Status of TOF voltage controls]] (Nerses, Vanik)
+
* [[Status of TOF and tagger hodoscope voltage controls]] (Nerses, Vanik)
 
* Any other business
 
* Any other business
 +
 +
= Minutes =
 +
 +
Present: Dave, Mike, Nerses, Vanik, Orlando, Beni, Elton
 +
 +
===Gas System===
 +
* Dave showed details of the gas system controls for CDC and FDC.
 +
* Mike presented his EPICS GUIs for gas system control.
 +
 +
=== TOF voltages === 
 +
* Vanik and Nerses are working on TOF voltage controls.
 +
* Vanik showed preliminary control screens for TOF voltages.
 +
 +
 +
= Action items =
 +
* Dave needs to implement alarms on the supply pressure
 +
* Mike will implement some parameters that Dave can use to adjust the cycling of the pressure measurements
 +
* Mike will find  a way to turn the gas off without changing the set-point
 +
* Dave will check if Brooks controllers allow the valve to be shut off
 +
* Beni wants to have a bottle at the T to run gas into CDC, Dave will set it up.
 +
* Nerses and Vanik will finish the TOF voltages and start tagger hodoscope voltage controls

Revision as of 10:21, 28 May 2014

Agenda

Minutes

Present: Dave, Mike, Nerses, Vanik, Orlando, Beni, Elton

Gas System

  • Dave showed details of the gas system controls for CDC and FDC.
  • Mike presented his EPICS GUIs for gas system control.

TOF voltages

  • Vanik and Nerses are working on TOF voltage controls.
  • Vanik showed preliminary control screens for TOF voltages.


Action items

  • Dave needs to implement alarms on the supply pressure
  • Mike will implement some parameters that Dave can use to adjust the cycling of the pressure measurements
  • Mike will find a way to turn the gas off without changing the set-point
  • Dave will check if Brooks controllers allow the valve to be shut off
  • Beni wants to have a bottle at the T to run gas into CDC, Dave will set it up.
  • Nerses and Vanik will finish the TOF voltages and start tagger hodoscope voltage controls