Difference between revisions of "DIRC"

From GlueXWiki
Jump to: navigation, search
(DIRC Analysis)
 
(62 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
  
 +
[[GlueX Upgrade PID Meetings]]
  
=== DIRC Detector ===
+
== DIRC Analysis ==
  
 +
* Dataset summaries: [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary Spring/Summer 2020]
 +
* Reconstruction in [https://github.com/JeffersonLab/halld_recon/tree/master/src/libraries/DIRC halld_recon]
 +
* [https://github.com/JeffersonLab/hd_utilities/tree/master/dirc/standalone Standalone reconstruction] for studies with specific non-standard TTree format
 +
* Using DIRC in the standard Analysis TTree (PART) format:
 +
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4607 DSelector Documentation]
 +
** Suggested studies for new analyzers
  
=== Reviews ===
+
== DIRC Detector ==
*[[2015_October_14_DIRC_Project_Review|DIRC Capital Equipment Project Review]] October 2015
+
 
*[[ GlueX-II and DIRC ERR ]] June 2018
+
[[File:PixelHit3D Pi+ Bar7 xbin19.gif|200px|thumb|right|DIRC Movie: Bar 7, x=(0,5) cm]]
 +
 
 +
=== Fused silica bar boxes ===
 +
* Documents from BaBar and transportation (on DocDB)
 +
 
 +
=== Optical and bar box ===
 +
* [[Remaining items from Bates]]
 +
* [[Bill's to do list]]
 +
* [[Bar box darkening procedure]]
 +
* [https://halldweb.jlab.org/DocDB/0039/003983/001/main.pdf Momentive RTV 615 Cookie Documentation]
 +
* Square Pattern Diffuser Documnetaition
 +
 
 +
=== Multianode PMTs ===
 +
* [https://www.hamamatsu.com/resources/pdf/etd/H12700_TPMH1348E.pdf Hamamatsu H12700 Datasheet]
 +
* [[MAPMT Characterization]]
 +
 
 +
=== Electronics ===
 +
* [[Level-1_Trigger|Level-1 trigger documentation]] and [[DIRC_Readout|DIRC readout]] cabling to rocTrig1
 +
* [[HallD_Online_IP_Name_And_Address_Conventions|HallD Online IP Name And Address Conventions]]: DIRC crate is rocDIRC with IP: 129.57.139.92
 +
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3704 SSP data format document]
 +
* [[Mapping of Cables and Fibers]]
 +
 
 +
=== Software ===
 +
* [[DIRC Software Overview]]
 +
* [[DIRC Software Tasks]]
 +
* [[DIRC CCDB Tables]]
 +
* [[Monitoring Tools]]
 +
 
 +
=== Slow Controls ===
 +
* [https://halldweb.jlab.org/wiki/images/6/63/DIRC_Controls_6718.pdf Presentation] by Nick Sandoval (June 2018)
 +
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Shift worker instructions] (in progress)
 +
 
 +
=== Ongoing Tests ===
 +
* [[Water test]]
 +
* [[Mirror prototype test plan]]
 +
 
 +
== Water Quality Test and Control ==
 +
* [[Water Sample Test Tracking]]
 +
 
 +
== To-do List For Next Major Maintenance ==
 +
* [[2020 Winter - 2021 Spring]]
 +
 
 +
== Commissioning ==
 +
* [[Spring 2019 DIRC Commissioning]]
 +
* [[Fall 2019 DIRC Commissioning]]
 +
* [[Summer 2020 DIRC Commissioning]]
 +
 
 +
== Reviews ==
 +
* [[2015_October_14_DIRC_Project_Review|DIRC Capital Equipment Project Review]] October 2015
 +
* [[ GlueX-II and DIRC ERR ]] June 2018
 
** [[Addressing ERR review recommendations]]
 
** [[Addressing ERR review recommendations]]
 +
 +
== Instructions for Experts ==
 +
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Expert_Instructions Expert Instruction Page]
 +
 +
== Shifter Operation Manual ==
 +
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Shifter Operation Manual]
 +
 +
== Spare Equipment ==
 +
* [[DIRC Spare Parts and Storage location]]
 +
* [[Sequence to Recover Non-responding DIRC PMT Modules]]
 +
 +
= Documentation =
 +
* [https://dspace.mit.edu/handle/1721.1/119104 Fast DIRC Thesis] (John Hardin)
 +
 +
= DIRC Operation Issues Tracking =
 +
* [[PMT tiles missing after restarting data taking]]
 +
* [[DIRC LV Power Cycling Schedule]]
 +
 +
= Relevant data validation page =
 +
* [[RunPeriod-2019-11 Validation]]

Latest revision as of 11:55, 3 August 2022

GlueX Upgrade PID Meetings

DIRC Analysis

DIRC Detector

DIRC Movie: Bar 7, x=(0,5) cm

Fused silica bar boxes

  • Documents from BaBar and transportation (on DocDB)

Optical and bar box

Multianode PMTs

Electronics

Software

Slow Controls

Ongoing Tests

Water Quality Test and Control

To-do List For Next Major Maintenance

Commissioning

Reviews

Instructions for Experts

Shifter Operation Manual

Spare Equipment

Documentation

DIRC Operation Issues Tracking

Relevant data validation page