Difference between revisions of "DIRC"

From GlueXWiki
Jump to: navigation, search
(DIRC Operation Tracking)
(DIRC Analysis)
 
(17 intermediate revisions by 2 users not shown)
Line 2: Line 2:
  
 
[[GlueX Upgrade PID Meetings]]
 
[[GlueX Upgrade PID Meetings]]
 +
 +
== DIRC Analysis ==
 +
 +
* Dataset summaries: [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary Spring/Summer 2020]
 +
* Reconstruction in [https://github.com/JeffersonLab/halld_recon/tree/master/src/libraries/DIRC halld_recon]
 +
* [https://github.com/JeffersonLab/hd_utilities/tree/master/dirc/standalone Standalone reconstruction] for studies with specific non-standard TTree format
 +
* Using DIRC in the standard Analysis TTree (PART) format:
 +
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4607 DSelector Documentation]
 +
** Suggested studies for new analyzers
  
 
== DIRC Detector ==
 
== DIRC Detector ==
Summary
 
  
 
[[File:PixelHit3D Pi+ Bar7 xbin19.gif|200px|thumb|right|DIRC Movie: Bar 7, x=(0,5) cm]]
 
[[File:PixelHit3D Pi+ Bar7 xbin19.gif|200px|thumb|right|DIRC Movie: Bar 7, x=(0,5) cm]]
Line 40: Line 48:
 
=== Ongoing Tests ===
 
=== Ongoing Tests ===
 
* [[Water test]]
 
* [[Water test]]
 +
* [[Mirror prototype test plan]]
 +
 +
== Water Quality Test and Control ==
 +
* [[Water Sample Test Tracking]]
 +
 +
== To-do List For Next Major Maintenance ==
 +
* [[2020 Winter - 2021 Spring]]
  
 
== Commissioning ==
 
== Commissioning ==
 
* [[Spring 2019 DIRC Commissioning]]
 
* [[Spring 2019 DIRC Commissioning]]
 
* [[Fall 2019 DIRC Commissioning]]
 
* [[Fall 2019 DIRC Commissioning]]
 +
* [[Summer 2020 DIRC Commissioning]]
  
 
== Reviews ==
 
== Reviews ==
Line 51: Line 67:
  
 
== Instructions for Experts ==
 
== Instructions for Experts ==
* [https://halldweb.jlab.org/hdops/wiki/index.php/Threshold_Scan_Procedure Threshold Scan]
+
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Expert_Instructions Expert Instruction Page]
* LED Run Procedure
+
 
 +
== Shifter Operation Manual ==
 +
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Shifter Operation Manual]
  
 
== Spare Equipment ==
 
== Spare Equipment ==
 
* [[DIRC Spare Parts and Storage location]]
 
* [[DIRC Spare Parts and Storage location]]
 
* [[Sequence to Recover Non-responding DIRC PMT Modules]]
 
* [[Sequence to Recover Non-responding DIRC PMT Modules]]
 +
 +
= Documentation =
 +
* [https://dspace.mit.edu/handle/1721.1/119104 Fast DIRC Thesis] (John Hardin)
  
 
= DIRC Operation Issues Tracking =
 
= DIRC Operation Issues Tracking =
 +
* [[PMT tiles missing after restarting data taking]]
 +
* [[DIRC LV Power Cycling Schedule]]
 +
 +
= Relevant data validation page =
 +
* [[RunPeriod-2019-11 Validation]]

Latest revision as of 11:55, 3 August 2022

GlueX Upgrade PID Meetings

DIRC Analysis

DIRC Detector

DIRC Movie: Bar 7, x=(0,5) cm

Fused silica bar boxes

  • Documents from BaBar and transportation (on DocDB)

Optical and bar box

Multianode PMTs

Electronics

Software

Slow Controls

Ongoing Tests

Water Quality Test and Control

To-do List For Next Major Maintenance

Commissioning

Reviews

Instructions for Experts

Shifter Operation Manual

Spare Equipment

Documentation

DIRC Operation Issues Tracking

Relevant data validation page