(Thursday, December 5)
Line 19: Line 19:
 
* [[Run Coordination Meetings:Fall2019 Run]]
 
* [[Run Coordination Meetings:Fall2019 Run]]
 
* [[Fall 2019 DIRC Commissioning|DIRC Fall 2019 Run Plan]]
 
* [[Fall 2019 DIRC Commissioning|DIRC Fall 2019 Run Plan]]
 +
 +
== Tuesday, December 10 ==
 +
* First field-on data Friday evening: Run 70817+
 +
** Initial issues with timing now resolved and data processing
 +
** Initial data reconstruction underway:
 +
*** REST, histogram and tree files appearing at: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver00
 +
* Unfortunate data loss: Run 70850-70895
 +
* LED Analysis: (Ahmed/Bill/Andrew)
 +
* Upcoming plans:
 +
** When beam is back continue with nominal conditions: Threshold = pedestal + 100, equalized gains,  HV = 1000 V
 +
** Dedicated runs with GEM detector included with low trigger rate
  
 
== Thursday, December 5 ==
 
== Thursday, December 5 ==

Revision as of 08:42, 10 December 2019

Meeting Information

GlueX DIRC Meeting
Tuesdays and Thursdays, December 3-19
10:00 am, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.


Useful Links:

Tuesday, December 10

  • First field-on data Friday evening: Run 70817+
    • Initial issues with timing now resolved and data processing
    • Initial data reconstruction underway:
      • REST, histogram and tree files appearing at: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver00
  • Unfortunate data loss: Run 70850-70895
  • LED Analysis: (Ahmed/Bill/Andrew)
  • Upcoming plans:
    • When beam is back continue with nominal conditions: Threshold = pedestal + 100, equalized gains, HV = 1000 V
    • Dedicated runs with GEM detector included with low trigger rate

Thursday, December 5

  • Collected straight track data in "beam left" position: see correlations with TRD wire chamber and GEM SRS (APV) modules
    • A couple runs with DIRC included for initial tests (70720 and 70721)
  • LED Analysis: (Ahmed/Bill)
  • Upcoming plans:
    • Today/tonight: Straight track data in center and right positions by Friday morning.
    • Friday: Ramp solenoid and setup for DIRC commissioning
    • Weekend: DIRC commissioning with full solenoid field!

Tuesday, December 3

  • Status update from the Hall
  • Plans for straight track data