Difference between revisions of "GlueX BeamTests"

From GlueXWiki
Jump to: navigation, search
(2011 Hall B Run)
Line 6: Line 6:
  
 
* [[2011 Hall B FCAL Beam Test]] (includes minutes from our 'Beam Test Group Meetings')
 
* [[2011 Hall B FCAL Beam Test]] (includes minutes from our 'Beam Test Group Meetings')
 +
 +
== PS ==
 +
 +
=== 2012 Hall B Run ===
 +
 +
# [https://halldweb.jlab.org/wiki/index.php/Private:Pair_Spectrometer_beam_test Beam test of the prototype]
 +
 +
  
 
== BCAL ==
 
== BCAL ==

Revision as of 17:02, 4 September 2019

GlueX Beam Tests

FCAL

2011 Hall B Run

PS

2012 Hall B Run

  1. Beam test of the prototype


BCAL

2012 Hall B Run

  1. BCAL Beam Tests 2012
  2. 2011 Hall B Bcal Goals

2006 Hall B Run and Cosmics